Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 5 of 5

# details full text citation check to select
1. 100%; open Atkin B L (1999) Refocusing project delivery systems on adding value, Lacasse M A, Vanier D J (ed.); Information technology in construction, volume 4, ISBN 0-660-17743-9; Vancouver, May 30 - June 3, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1999-2803
2. 100%; open Atkin B L (1999) Measuring information integration in project teams, Lacasse M A, Vanier D J (ed.); Information technology in construction, volume 4, ISBN 0-660-17743-9; Vancouver, May 30 - June 3, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1999-2791
3. 100%; open Atkin, B.L. (1986) A Multi-Stage Decision Model for Use at the Early Design Stage of Construction Projects, Proceedings of the 10th Triennial Congress of the International Council for Building Research, Studies and Documentation: CIB 86: advancing building technology: CIB W78, Washington, USA, 22-26 September, pg. 907-914 http://itc.scix.net/cgi-bin/works/Show?w78-1986-108
4. 100%; open Atkin, B.L. (1986) Computer-aided Design and its Implications for the Management of Construction Projects, Proceedings of the 10th Triennial Congress of the International Council for Building Research, Studies and Documentation: CIB 86: advancing building technology: CIB W78, Washington, USA, 22-26 September, pg. 19-26 http://itc.scix.net/cgi-bin/works/Show?w78-1986-3
5. 100%; open Bridgewater, C. and Atkin, B. (1990) Design for Automation: An Operational Framework, Proceedings of CIB W78+74, CIB Publication 138, Tatsuo Terai (editor), Tokyo, Japan, 17-19 September, pg. 193-200 http://itc.scix.net/cgi-bin/works/Show?w78-1990-b22

No more hits.

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003