Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 21 to 30 of 61

# details full text citation check to select
21. 100%; open Hongjun Wang, Burcu Akinci, and James H. Garrett Jr. (2006) A Semi-Automated Schema Matching Approach Based On Automated Dection Of Version Differences, Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June http://itc.scix.net/cgi-bin/works/Show?w78-2006-tf256
22. 100%; open J Lin, J Zhang, Q Wen, F Wang (2015) Leveraging BIM in Settlement Monitoring and Impact Management for Subway Excavation, Proceedings of the 32nd International Conference of CIB W78, Eindhoven, The Netherlands, 27-29 October, 469-477 http://itc.scix.net/cgi-bin/works/Show?w78-2015-paper-049
23. 100%; open J Wang, N Pradhananga, J Teizer (2014) Automatic Fall Risk Identification Using Point Cloud Data in Construction Excavation, Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 981-988 http://itc.scix.net/cgi-bin/works/Show?w78-2014-paper-122
24. 100%; open J Wang, X Wang, W Shou, J Guo, L Hou (2014) Development of BIM Model Fitness Review System for Modelling Quality Control, Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 577-584 http://itc.scix.net/cgi-bin/works/Show?w78-2014-paper-072
25. 100%; open J Wang, X Wang, W Shou, J Guo (2013) An Approach of Utilizing Building Information Modeling to Optimize MEP Layout, Proceedings of the 30th International Conference of CIB W78, Beijing, China, 19-12 October, 690-699 http://itc.scix.net/cgi-bin/works/Show?w78-2013-paper-151
26. 100%; open Jun Wang, Wenchi Shou, Peng Wu and Xiangyu Wang (2017) Linked Data for Cross-Domain Constraint Information Sharing in LNG Construction, Lean and Computing in Construction Congress (LC3): Volume I Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 811-818 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-318
27. 100%; open L Hou, C Wu, X Wang, J Wang (2014) A Framework Design for Optimizing Scaffolding Erection by Applying Mathematical Models and Virtual Simulation, Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 323-330 http://itc.scix.net/cgi-bin/works/Show?w78-2014-paper-041
28. 100%; open Li Y, Wang S Q (2003) A framework for evaluating it benefits in construction companies, Amor R (editor) Proceedings of the CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284, ISBN 0-908689-71-3, Waiheke Island, New Zealand, 23-25 April 2003, pg. 193-204. http://itc.scix.net/cgi-bin/works/Show?w78-2003-193
29. 100%; open Lingyun Wang, Alexander Zolotov, and John I. Messner (2006) A 4D CAD Learning Module For Short Interval Production Scheduling, Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June http://itc.scix.net/cgi-bin/works/Show?w78-2006-tf502
30. 100%; open Lingyun Wang, John I. Messner, Robert Leicht (2007) Assessement of 4D modeling for schedule visualization in construction engineering education, 737 http://itc.scix.net/cgi-bin/works/Show?w78_2007_50

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
show page 1 show page 2 this is page 3 show page 4 show page 5 show page 6 show page 7 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003