Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 19

# details full text citation check to select
1. 100%; open A. Al-Bazi, N. Dawood & Z. Khan (2009) Development of Hybrid Simulation and Genetic Algorithms System for Solving Complex Crew Allocation Problems, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-43
2. 100%; open Aoki, Y., Ikeda, S. and Yamagata, Y. (1986) A Computer-Aided Room Allocation Model with Concepts of Frameableness and Flexible Conditions, Proceedings of the 10th Triennial Congress of the International Council for Building Research, Studies and Documentation: CIB 86: advancing building technology: CIB W78, Washington, USA, 22-26 September, pg. 11-18 http://itc.scix.net/cgi-bin/works/Show?w78-1986-2
3. 100%; open Arthur W T Leung, C M Tam (2010) Assessment of Impacts of Project Technical Complexity on Building Production Using Clustering and Knowledge-Based System, CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-14
4. 100%; open Ching-Tsung Hung, Jia-Ruey Chang, Hsin-Lung Liu, and Gwo-Hshiung Tzeng (2006) Optimal Resource Allocation Model For Pavement Maintenance Established By De Novo Programming Method, Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June http://itc.scix.net/cgi-bin/works/Show?w78-2006-tf523
5. 100%; open Dragana Nikolic, Sanghoon Lee, John I. Messner, Chimay Anumba (2010) The Virtual Construction Simulator: Evaluating an Educational Simulation Application for Teaching Construction Management Concepts, CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-110
6. 100%; open J. Lopes de Almeida, M. Conceição Cunha (2006) Optimum Water Allocation In A Multipurpose Reservoir With Hourly Varying Hydroelectric Tariff And Seasonally Varying Agricultural Production Response, Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June http://itc.scix.net/cgi-bin/works/Show?w78-2006-tf123
7. 100%; open Juergen Melzner, Jochen Hanff and Jochen Teizer (2017) Pattern-Based Generation of 4D-Schedules for Robust Construction Management, Lean and Computing in Construction Congress (LC3): Volume I – Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 185-192 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-223
8. 100%; open Kassem M,Chavada R,Dawood N,Benghi C,Sanches R (2013) Road construction projects: an integrated and interactive visual tool for planning earthwork operations, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-58
9. 100%; open Leung A W T, Tam C M (2003) Scheduling for high-rise building construction using simulation techniques, Amor R (editor) Proceedings of the CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284, ISBN 0-908689-71-3, Waiheke Island, New Zealand, 23-25 April 2003, pg. 186-193. http://itc.scix.net/cgi-bin/works/Show?w78-2003-186
10. 100%; open Mahmoud O. Abou-Beih, Tamer E. El-Diraby, Baher A. Abdulhai (2010) Coordinating Urban Incident Management & Reconstruction Using Social Web, CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-102

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003