A decision support system for building refurbishment design

Abstract: "Refurbishment work in the EC currently accounts for more than one-third of the total construction output. This market is expected to grow stronger with the progressive ageing of buildings and the environment impetus to retain buildings. A further dimension is the need to adapt buildings for a greying population. There are important differences between refurbishment and new construction works. The existing building constraints the design solutions, construction technologies and work methods. Mechanisation, planning, and efficient organisation of refurbishment work is difficult, due to the small, labour intensive, and ad hoc, dynamic nature of the work. Also due to the relatively small scale of refurbishment projects, there have been no opportunities for standardisation and the applications of prefabrication and industrialisation are limited. Today, larger sized contractors are rapidly moving into the refurbishment market, in response to the shrinking new-build market and the higher technological demands of large scale refurbishment projects. The EC funded Brite Euram project 4670 is titled ‘Decision Support Systems for Building Refurbishment.’ This project has started in August 1998 and will finish in July 2001. Its objective is to develop a socio-technological-commercial framework and corresponding Decision Support Systems (DSSs) for housing refurbishment, to achieve: ? refurbishments which are more focused on user requirements; ? refurbishment designs which take into account the constraints of the existing building structure; ? increased incorporation of industrialised systems and components; ? organisational procedures and production technologies that recognise the unique nature of refurbishment work. The project is divided into three tasks. Task one aims at developing a DSS for the determination of the refurbishment demand and ballpark costs. Task two involves the development of a DSS for refurbishment design. Task three will result in a DSS for refurbishment process planning and control. This paper describes the approach followed for the ongoing development in task two, the DSS for refurbishment design. The main objectives of this task are to provide decision support at the project level. It will develop a database of layouts of representative existing housing estates and a database of preferred refurbishment layouts for these representative existing housing estates. Another database will be developed containing information on building systems and components that are relevant for the refurbishment process. Task two will establish a protocol for refurbishment design support. This protocol, which is implemented in a decision support information system, involves a number of steps that aid the user in selecting an appropriate housing layout and building systems and components that meet the user’s requirements. These steps involve the evaluation of a the user’s refurbishment demands and selection of a matching representative existing housing layout. Based on further dialog with the system, a preferred refurbishment layout is selected, which in turn is used as the basis for the selection of building systems and components that meet the performance requirements as stated by the user. The paper describes the methodology that is implemented in the system for retrieving performance requirements from the user, and the approaches for matching these to the stock of existing and preferred housing layouts available in the system’s database. The system is characterised by a flexible architecture of both the databases and the user interface, which results in a scalable system that allows the expansion of the databases with new graphical layouts and building systems and components, as well as the addition of new kinds of performance requirements. The system is implemented as an Internet application, which allows the database to be maintained centrally and facilitates world wide access to the system. The system’s implementation involves the combination of graphical and non-graphical data that can be queried and matched with only typical Internet browsing software installed at the client-side."

Keywords:

DOI:

Full text: content.pdf (465,782 bytes) (available to registered users only)

Series: w78:2000 (browse)
Cluster: papers of the same cluster (result of machine made clusters)
Class: class.man-software (0.029035) class.environment (0.012122) class.impact (0.010657)
Similar papers:
Sound: read aloud.

Permission to reproduce these documents have been graciously provided by Icelandic Building Research Institute. The assistance of the editor, Mr. Gudni Gudnason, is gratefully appreciated


Computer aided conformance checking

Abstract: In the building process a number of problems exist with regardtobuilding regulations, causing the conformance checking process to be an island in the building process. This paper discusses an approach that enables us to perform computer aided conformance checking and to integrate the conformance checking process in the building process. The approach is based on the use of product models. This paper discusses theoretical as well as implementationaspects. The paper is an extended abstract of the Ph.D. thesis written by the author (De Waard 92).

Keywords:

DOI:

Full text: content.pdf (1,550,159 bytes) (available to registered users only)

Series: w78:1992 (browse)
Cluster: papers of the same cluster (result of machine made clusters)
Class: class.legal (0.035798) class.synthesis (0.030841) class.communication (0.017275)
Similar papers:
Sound: read aloud.

Permission to reproduce these papers has been graciously provided by Research Press of the National Research Council of Canada. The support of the editor, Dr. Dana Vanier, is gratefully appreciated.


A Akanmu, C J. Anumba, J I. Messner

Mechanisms for Bi-directional Coordination between Virtual Design and the Physical Construction

Abstract: There is considerable growth in the use of virtual models in the construction industry. Many projects are now based on fairly sophisticated models but the use of these models is often limited to the design and tendering/bidding stage. Much more benefit can be derived from these models by extending their use to the construction, operation and maintenance phases of a facility’s lifecycle. A good way of achieving this will involve real-time bi-directional coordination between as-designed models and the physical construction. This will enable improvements in progress monitoring, construction process control, archiving as-built status and active control of building components and sub-assemblies. To maintain bi-directional coordination, computational resources are required to tightly integrate the virtual models and the physical construction. This is termed a Cyber-Physical systems approach. This paper focuses on describing the role of the Cyber-physical systems approach in enhancing bi-directional coordination. It highlights the mechanisms necessary to facilitate this and presents future deployment scenarios to illustrate the potential benefits to the construction industry.

Keywords: Bi-directional coordination, Building Information Models, Cyber-Physical Systems, Physical Construction

DOI:

Full text: content.pdf (352,164 bytes) (available to registered users only)

Series: w78:2011 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.


A Akcamete

An Approach to Capture Facility Maintenance and Repair Information to Store Change History

Abstract: During operations, changes happen to facilities frequently due to maintenance and repair (M&R)work, upgrades and renovations. Consequently, corresponding facility information needs to be updatedso as to provide reliable information to facility operators and managers. Moreover, the record offacility changes is necessary to understand the patterns of failures and to support proactivemaintenance decisions. Therefore, there is a need to enable storing of the information about suchchanges at the time that they occur. In current practice, facility documents are not frequently updatedand a complete history of changes is not available for supporting facility management decisions. Theauthors_ objective is to streamline the capturing of M&R information when these activities areperformed, so as to have a history of facility changes that can be used to understand how a building isdeteriorating and to support facility information updates. By observing M&R work records, weidentified the need for capturing different types of facility and change information for different typesof M&R work. Moreover, we observed the need for a spatial database to support pattern analysis byidentifying clusters that may not be found by using traditional databases. We developed a taxonomy ofM&R work that classifies various types of work on different types of facility components and listsassociated information modules that represent data required to be collected in the field. This approachenables a formal approach for capturing change information as a result of M&R work by providingcustomized templates for each type of work. The focus of this paper is to present the need forcustomization of information capture templates. The paper also gives a description of the approach offormally generating customized templates based on a taxonomy of M&R work and linking thecaptured history information with a facility information model. Enabling such a linkage will be thefirst step towards reasoning about the M&R history in order to analyze how a building deteriorates,identify problems in the building, and inform the users of facility information update needs.

Keywords: Facility maintenance, maintenance changes, change history, maintenance planning

DOI:

Full text: content.pdf (769,778 bytes) (available to registered users only)

Series: w78:2011 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.


A Albogamy, N Dawood, D Scott

A Risk Management Approach to Address Construction Delays from the Client Aspect

Abstract:

Keywords:

DOI:

Full text: content.pdf (239,489 bytes) (available to registered users only)

Series: w78:2014 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.


A Behnam, T Harfield, R Kenley

Linear vs. Systems Approach to Production Scheduling in Construction

Abstract:

Keywords:

DOI:

Full text: content.pdf (97,838 bytes) (available to registered users only)

Series: w78:2016 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.


A Ciribini & G Galimberti

4D Project Planning and H&S Management

Abstract: A The European Client Organisations must face huge responsibilities by 92/57/EC Directive when the Health and Safety Management System has to be built in. Moreover, Public Client Organisations are trying, in different ways, to cope with such duties in modifying their Project Execution Plans over time so to update project schedules and reports complying with H&S Plan-related measures. The researchers have performed a detailed analysis which should allow Project Sponsors and Project Managers to deal with Time Management following a safety-oriented approach.

Keywords:

DOI:

Full text: content.pdf (505,136 bytes) (available to registered users only)

Series: w78:2005 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.

Permission to reproduce these papers has been graciously provided by the Technische Universität Dresden.


A Fateh, F Hejazi, M R Khojasteh

Seismic Performance Evaluation of Steel Shear Wall by Equivalent Truss Approach Modeling

Abstract:

Keywords:

DOI:

Full text: content.pdf (172,008 bytes) (available to registered users only)

Series: w78:2014 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.


A Galach & Z Kotulski

Risk assessment in disaster recovery strategies development

Abstract: The paper describes the model for selecting disaster recovery strategies for information system. The risk assessment covers the threats and vulnerabilities related to the problem of losing the availability of information processes in the particular information system model. The analysis takes under consideration the relationships between the components of information system in order to find the risk of availability lost propagation within the system. That is the basis for finding the candidate disaster recovery strategies, which have to fulfil these basic requirements. Such an approach allows sifting these ones, which are basically not suitable for the security requirements of the information system. The preliminary accepted strategies are to be analyzed regarding to the estimated cost of implementation and maintenance. The next phase covers the detailed analysis of confidentiality and integrity risks in the candidate strategies. The level of risk related to the confidentiality and integrity of information processed in the disaster situation using given strategy is to be estimated.

Keywords:

DOI:

Full text: content.pdf (232,912 bytes) (available to registered users only)

Series: w78:2005 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.

Permission to reproduce these papers has been graciously provided by the Technische Universität Dresden.


A Ganah, G A John

Understanding BIM in the UK Construction Industry using an Activity Theory (AT) Approach

Abstract:

Keywords:

DOI:

Full text: content.pdf (108,112 bytes) (available to registered users only)

Series: w78:2016 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.