Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 37

# details full text citation check to select
1. 100%; open A Asadi, A Hadavi, R J. Krizek (2011) Bridge Life-Cycle Cost Analysis Using Artificial Neural Networks, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-37
2. 100%; open Al-Hajj A, Aouad G (1999) The development of an integrated life cycle costing model using object oriented and vr technologies, Lacasse M A, Vanier D J (ed.); Information technology in construction, volume 4, ISBN 0-660-17743-9; Vancouver, May 30 - June 3, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1999-2901
3. 100%; open Anders Vennstrom, Thomas Olofsson, William Fawcett, Attila Dikbas, Esin Ergen (2010) Determination and Costing of Sutainiable Construction Projects: Option Based Decision Support, CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-58
4. 100%; open Bloomfield D, Faraj I, Jarvis P, Anumba C (1999) Managing and exploiting knowledge assets in the construction industry, Lacasse M A, Vanier D J (ed.); Information technology in construction, volume 4, ISBN 0-660-17743-9; Vancouver, May 30 - June 3, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1999-2419
5. 100%; open C Kasprzak, C Dubler, E Gannon, E Nulton (2011) ALIGNING BIM WITH FM: STREAMLINING THE PROCESS FOR FUTURE PROJECTS ON THE PENNSYLVANIA STATE UNIVERSITY CAMPUSES, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-74
6. 100%; open Carrillo P M, Anumba C J, Kamara J M (2000) Knowledge management strategy for construction: key I.T. and contextual issues, Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000 http://itc.scix.net/cgi-bin/works/Show?w78-2000-155
7. 100%; open Caty Werey, David Dorchies, Isabelle Mellac Beck (2006) Sewer Asset Management - Assessing Criteria For A Multi-Criteria Decision Support On A County Level Database, Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June http://itc.scix.net/cgi-bin/works/Show?w78-2006-tf142
8. 100%; open Clarke P, Clarke J (1999) Analysis of phenomenological perceptions of effectiveness of information technology in computerised maintenance management, Lacasse M A, Vanier D J (ed.); Information technology in construction, volume 4, ISBN 0-660-17743-9; Vancouver, May 30 - June 3, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1999-2296
9. 100%; open Clarke P, Heathcote K (2001) A longitudinal study into perceptions of the effect of I.T. on training, human relations and productivity as function of position, age, experience and gender, Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2 http://itc.scix.net/cgi-bin/works/Show?w78-2001-49
10. 100%; open Clarke P (2000) Effectiveness of I.T. in computerised maintenance management: a longitudinal study of the analysis of phenomenological perceptions., Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000 http://itc.scix.net/cgi-bin/works/Show?w78-2000-219

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 show page 3 show page 4 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003