Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 14

# details full text citation check to select
1. 100%; open BŁgler M,Dori G,Borrmann A (2013) Swap based process schedule optimization using discrete-event simulation, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-24
2. 100%; open Chao L C (1999) Simulation of construction operation with direct inputs of physical factors, Lacasse M A, Vanier D J (ed.); Information technology in construction, volume 4, ISBN 0-660-17743-9; Vancouver, May 30 - June 3, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1999-2287
3. 100%; open Craig R. Dubler, John I. Messner (2010) Evaluating the Value of Early Planning for Building Information Modeling using Lean Theory, CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-40
4. 100%; open D Greenwood, S Lockley, O Jones, P Jones (2011) THE EFFICACY OF REALISTIC VIRTUAL ENVIRONMENTS IN CAPTURING USER EXPERIENCE OF BUILDINGS, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-108
5. 100%; open Flood I,Nowrouzian V (2013) Construction process modelling: a constrained graphics approach versus conventional construction simulation, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-26
6. 100%; open Futcher K G (2001) User survey on a wan portfolio M.I.S. used for porfolio/project management in Hong Kong., Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2 http://itc.scix.net/cgi-bin/works/Show?w78-2001-75
7. 100%; open Omar H-S,Jahnkassim P-S,Mahmud M (2013) Pilot tests of augmented realities in science displays and design presentations, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-44
8. 100%; open Park M, Pena-Mora F (2003) Development of Dynamic Planning and Control Methodology (DPM): based on the user-defi ned dynamic modeling approach, International Journal of IT in Architecture, Engineering and Construction (IT-AEC), Volume 1, Issue 4, Rotterdam: Millpress Science Publishers http://itc.scix.net/cgi-bin/works/Show?itaec-2003-22
9. 100%; open Pe?a-Mora F, Craig M (2004) AVSAR: a collaboration system for disaster search and rescue operations using autonomous vehicles, International Journal of IT in Architecture, Engineering and Construction (IT-AEC), Volume 2, Issue 2, Rotterdam: Millpress Science Publishers http://itc.scix.net/cgi-bin/works/Show?itaec-2004-9
10. 100%; open Semenov V,Anichkin A,Morozov S,Tarlapan O,Zolotov V (2013) Effective project scheduling under workspace congestion and workflow disturbance factors, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-25

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003