Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 29

# details full text citation check to select
1. 100%; open Chan P (2003) The use of web-based tools to support a contractual claim in arbitration or litigation, Amor R (editor) Proceedings of the CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284, ISBN 0-908689-71-3, Waiheke Island, New Zealand, 23-25 April 2003, pg. 65-73. http://itc.scix.net/cgi-bin/works/Show?w78-2003-65
2. 100%; open Couzens A, Thorpe T, Skitmore M (1993) Executive information system for construction contract ridding decisions, Mathur K S, Betts M P, Tham K W (editors); Management of information technology for construction; Singapore, August 1993 http://itc.scix.net/cgi-bin/works/Show?w78-1993-2-149
3. 100%; open Dreger G T (1993) Design-build procurement: a framework for integrated management information systems, Mathur K S, Betts M P, Tham K W (ed.); Pre-proceedings of the first international conference on the management of information technology for construction; Singapore, August 1993 http://itc.scix.net/cgi-bin/works/Show?w78-1993-40
4. 100%; open Dunstone, P.H. and Ashworth, G.N. (1986) 25 Years' Development of Computerised Contract Documentation - and the Future, Proceedings of the 10th Triennial Congress of the International Council for Building Research, Studies and Documentation: CIB 86: advancing building technology: CIB W78, Washington, USA, 22-26 September, pg. 976-983 http://itc.scix.net/cgi-bin/works/Show?w78-1986-116
5. 100%; open E Collins (1984) Experience in CAD 1976 - 1984, Proceedings of the 1st International Colloquium of CIB W78, CIB Publication 78, Watford, UK, 5-7 June, pg. 10-12 http://itc.scix.net/cgi-bin/works/Show?w78-1984-d1-4-collins
6. 100%; open Edward Jaselskis, William Rasdorf, Min Liu, Abdullah Alsharef, Frank Bowen, Majed Al-Ghandour and Larry Goode (2017) Factors Affecting Bid Let Dates on Transportation Mega Projects, Lean and Computing in Construction Congress (LC3): Volume I Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 3-10 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-081
7. 100%; open Engy Serag, Hesham Osman, Moustafa Ghanem (2010) Semantic Detection of Risks and Conflicts in Construction Contracts, CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-26
8. 100%; open Froese T (1995) Core process models and application areas in construction, Fischer M A, Law K H, Luiten B(ed.); Modelling of buildings through their life-cycle; Stanford, August 1995 http://itc.scix.net/cgi-bin/works/Show?w78-1995-427
9. 100%; open G. Polat & Y. Buyuksaracoglu (2009) Using discrete-event simulation for process modeling: Case of work structuring of asphalt highway construction operations, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-04
10. 100%; open Griffith E D, Hicks D K, McGraw K D, Case M P (1999) Towards model based design - a case study: the modular design system, Lacasse M A, Vanier D J (ed.); Information technology in construction, volume 4, ISBN 0-660-17743-9; Vancouver, May 30 - June 3, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1999-2579

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 show page 3 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003