Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 25

# details full text citation check to select
1. 100%; open A Albogamy, N Dawood, D Scott (2014) A Risk Management Approach to Address Construction Delays from the Client Aspect, Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 1497-1505 http://itc.scix.net/cgi-bin/works/Show?w78-2014-paper-186
2. 100%; open A Magdic & D Rebolj (2005) Human oriented mobile system for on-site problem solving, http://itc.scix.net/cgi-bin/works/Show?w78-2005-a4-3-magdic
3. 100%; open A.K. Jallow, P. Demian, A.N. Baldwin & C.J. Anumba (2009) BPM-driven Construction Client Requirements Change Management, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-08
4. 100%; open Chuen-Chyi Hsieh, Te-Che Chen, Ting-Wu Ho and Chien-Cheng Chou (2017) Taiwan High-Speed Trains Emergency Dispatching Using Ontology-Based, Multi-Agent Model, Lean and Computing in Construction Congress (LC3): Volume I Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 965-972 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-256
5. 100%; open Edward Jaselskis, William Rasdorf, Min Liu, Abdullah Alsharef, Frank Bowen, Majed Al-Ghandour and Larry Goode (2017) Factors Affecting Bid Let Dates on Transportation Mega Projects, Lean and Computing in Construction Congress (LC3): Volume I Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 3-10 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-081
6. 100%; open Euthimios Glymis, Athanasios Kanelakis, Georgios Aretoulis and Theodoros Mastoras (2017) Predicting Highway Projects' Actual Duration Using Neural Networks, Lean and Computing in Construction Congress (LC3): Volume I Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 691-697 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-260
7. 100%; open G. Polat & Y. Buyuksaracoglu (2009) Using discrete-event simulation for process modeling: Case of work structuring of asphalt highway construction operations, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-04
8. 100%; open Grazina J,Cachadinha N (2013) Towards a systematic production progress assessment based on AR on BIM prerequisites and functional requirements, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-31
9. 100%; open Gursans Guven and Esin Ergen (2017) Progress Monitoring of Masonry Work Via Resource Tracking Using Sensor-Based Technologies, Lean and Computing in Construction Congress (LC3): Volume I Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 957-964 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-170
10. 100%; open Ha_kan Norberg & Thomas Olofsson (2008) A PROCESS MODEL FOR CONSTRUCTION SYNCHRONISATION USING TIME-SPACE PLANNING METHODS AND FIELD FORCE AUTOMATION, CIB W78 2008 - Improving the management of construction projects through IT adoption http://itc.scix.net/cgi-bin/works/Show?w78-2008-1-02

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 show page 3 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003