Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 31 to 40 of 74

# details full text citation check to select
31. 100%; open Kiiski M (1994) Product model based software for structural design, Preproceedings, CIB W78 Workshop on Computer Integrated Construction, VTT, Espoo, Finland. http://itc.scix.net/cgi-bin/works/Show?w78-1994-37
32. 100%; open Kitchens, Kevin and Shiratuddin, Mohd Fairuz (2007) Interactive Home Design In A Virtual Environment, 7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 10-19. http://itc.scix.net/cgi-bin/works/Show?a893
33. 100%; open Kjell Svensson Magnus Hunhammar, Zabielski L (1994) Are scanned drawings sufficient for facility management work?, Preproceedings, CIB W78 Workshop on Computer Integrated Construction, VTT, Espoo, Finland. http://itc.scix.net/cgi-bin/works/Show?w78-1994-29
34. 100%; open Kooren, J.A. (1986) Transfer of Information via Drawings, Proceedings of the 10th Triennial Congress of the International Council for Building Research, Studies and Documentation: CIB 86: advancing building technology: CIB W78, Washington, USA, 22-26 September, pg. 139-149 http://itc.scix.net/cgi-bin/works/Show?w78-1986-17
35. 100%; open Laasonen M, Majahalme T (1994) Data models for geometrical physicality and material information for on site implementation in surveying, Preproceedings, CIB W78 Workshop on Computer Integrated Construction, VTT, Espoo, Finland. http://itc.scix.net/cgi-bin/works/Show?w78-1994-16
36. 100%; open Lehto M (1991) Knowledge-based CAD, Wagter H, Spoonamore J (ed.); The computer integrated future. CIB Seminar, 16-17 September, 1991. Eindhoven University of Technology, Calibre, The Netherlands http://itc.scix.net/cgi-bin/works/Show?w78-1991-14
37. 100%; open Lownertz K, Tarandi V (1994) Cad components, Preproceedings, CIB W78 Workshop on Computer Integrated Construction, VTT, Espoo, Finland. http://itc.scix.net/cgi-bin/works/Show?w78-1994-19
38. 100%; open M F Shamkhi, A Al-Hajj (2014) Assessing the Significance of Mismatching in Buildings' Final Drawings in Dubai Projects, Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 1538-1545 http://itc.scix.net/cgi-bin/works/Show?w78-2014-paper-191
39. 100%; open M Lo Prete, L Dal Cerro, V Bonora (2011) “Canopée des Halles de Paris” Case study for an innovative digital approach to tender competition, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-82
40. 100%; open M. J. Clayton & O. O. Ozener & C. A. Nome (2009) BIM to CAFM: An Investigation of Adapting a Building Information Model to a Legacy Computer Aided Facility Management, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-20

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
show page 1 show page 2 show page 3 this is page 4 show page 5 show page 6 show page 7 show page 8 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003