Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 11

# details full text citation check to select
1. 100%; open Chang Hak, Kim; Leen Seok, Kang; Sang Bok, Jee (2006) 4D System for Visualizing Schedule Progress of Horizontal Construction Project Including Earthwork, http://itc.scix.net/cgi-bin/works/Show?85cf
2. 100%; open Kassem M,Chavada R,Dawood N,Benghi C,Sanches R (2013) Road construction projects: an integrated and interactive visual tool for planning earthwork operations, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-58
3. 100%; open Lluch, J.F. (1986) Earthwork Analysis on Personal Computers, Proceedings of the 10th Triennial Congress of the International Council for Building Research, Studies and Documentation: CIB 86: advancing building technology: CIB W78, Washington, USA, 22-26 September, pg. 319-327 http://itc.scix.net/cgi-bin/works/Show?w78-1986-39
4. 100%; open Martinez J C (1998) EarthMover - simulation tool for earthwork planning, Bjork B C, Jagbecj A (ed.); The life-cycle of construction IT innovations. - Technology transfer from research to practice. [ Conference Proceedings / ISBN 91-7171-281-4] Stockholm (Sweden) 3-5 June 1998 http://itc.scix.net/cgi-bin/works/Show?w78-1998-29
5. 100%; open R. K. Shah, N. Dawood (2008) IMPROVING COMMUNICATION OF SCHEDULING INFORMATION OF EARTHWORK CONSTRUCTION PROCESS USING 4D VISUALISATION MODEL IN ROAD PROJECTS, CIB W78 2008 - Improving the management of construction projects through IT adoption http://itc.scix.net/cgi-bin/works/Show?w78-2008-4-07
6. 100%; open R. Kapur Shah, N. Dawood & J. Dean (2009) An Innovative Approach for Generation of Virtual Construction Model and a Time Location Plan for Road Construction Projects, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-42
7. 100%; open Raj Kapur Shah, Nashwan Dawood (2007) Development of innovative visualisation model in road construction, 499 http://itc.scix.net/cgi-bin/works/Show?w78_2007_74
8. 100%; open Shah R,Dawood N,Castro S (2013) Automatic generation and visualization of location-based scheduling, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-57
9. 100%; open Y. Ji, A. Borrmann, E. Rank, J. Wimmer & W. A. GŁnthner (2009) An Integrated 3D Simulation Framework for Earthwork Processes, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-23
10. 100%; open Yang Ji, Andre Borrmann, Johannes Wimmer, Willibald A. Gunthner (2010) Bidirectional Coupling of Macroscopic Optimization and Microscopic Simulation Of Earthwork Processes, CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-38

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003