Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 50

# details full text citation check to select
1. 100%; open A Ciribini & G Galimberti (2005) 4D Project Planning and H&S Management, http://itc.scix.net/cgi-bin/works/Show?w78-2005-d3-3-ciribini
2. 100%; open A. Borrmann, Y. Ji, I.-C. Wu, M. Obergrießer, E. Rank, C. Klaubert & W. Günthner (2009) ForBAU – The virtual construction site project, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-21
3. 100%; open Aparna Perikamana, Steven K. Ayer, Michael A. Beauregard and Suleiman Alsafouri (2017) Development of a Collaborative Process Mapping Activity to Improve Students' BIM Process Mapping Understanding, Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 989-995 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-061
4. 100%; open Augenbroe G, Amor R (1997) Project control in integrated building design systems, Drogemuller R (editor); International council for building research studies and documentation. workshop (1997, Cairns) Information technology support for construction process reengineering Proceedings of CIB workshop - w78 “Working commission on information technology in construction” and tg10 “Task group on computer representation of design standards and building codes”, Cairns, Queensland, Australia, July 9th-11th, 1997; ISBN 086-443-636X http://itc.scix.net/cgi-bin/works/Show?w78-1997-53
5. 100%; open B de Vries (2001) Building management simulation center, Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2 http://itc.scix.net/cgi-bin/works/Show?w78-2001-9
6. 100%; open B. Becerik-Gerber & S. Rice (2009) An Assessment of Building Information Modeling Value and Use, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-27
7. 100%; open Bester A, Huhnt W (2001) Tendering process model for application of reliability analysis, Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2 http://itc.scix.net/cgi-bin/works/Show?w78-2001-29
8. 100%; open Bügler M,Dori G,Borrmann A (2013) Swap based process schedule optimization using discrete-event simulation, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-24
9. 100%; open Carozza L,Bosché F,Abdel-Wahab M (2013) Image-based localization for an indoor VR/AR construction training system, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-37
10. 100%; open Christensen L C, Christiansen T R, Jin Y, Kunz J, Levitt R E (1995) Extending enterprise modeling beyond engineering - a life cycle model of hydraulic systems, Fischer M A, Law K H, Luiten B(ed.); Modelling of buildings through their life-cycle; Stanford, August 1995 http://itc.scix.net/cgi-bin/works/Show?w78-1995-543

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 show page 3 show page 4 show page 5 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003