A Almohsen, Janaka Ruwanpura

Logistics Management in Construction Industry

Abstract: The construction industry is often slower to adopt new technologies than other industries. Yet the construction industry shall embrace these technologies sufficiently in order to keep up with advances in other trades. One of the most crucial elements in construction management is productivity. And the adopting of new technologies such as mobile-based application can increase construction project productivity in such areas as materials management, tool use time, and labour motivations. Most of these aspects have been thoroughly investigated in academia; however, logistics management and its contribution to construction productivity have been insufficiently investigated, especially with respect to the use of advanced technologies. In this paper, we propose to develop a new platform to utilize modern technologies in the construction industry. Hence, the main objective of this paper is to introduce mobile-based application technologies into construction industry that will improve construction productivity by enhancing logistics management practices. The use of this model will not only help increase productivity in the construction industry but also it will make this industry more competitive with other industries. In order to achieve the main the goal of the paper, different building construction sites have been selected from which to collect data using direct observation, interviews and questionnaires. In order to ensure a high quality result, all participants were selected based on their relationship to the subject being examined. By using the outcomes of the data analysis to identify a potential solution, a computerized logistical management model was developed to examine how to enhance construction productivity and to improve logistics management practices. Many positive opinions have been granted form different constriction experts. Facilitating the communications between such project participants as contactors, subcontractors and suppliers is another expected result. Also, the model would help in organizing the schedule for the use of such heavy equipment as cranes.

Keywords: logistics management, advanced mobile-based application technologies, construction materials and equipment.

DOI:

Full text: content.pdf ( bytes) (available to registered users only)

Series: w78:2011 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.


A Thorpe, MJ Ward, S Bowden & ADF Price

Facilitating the link between point-of-production workers and corporate ICT systems in construction

Abstract: Web-based project management systems (WPMS) are becoming more widespread within construction and have shown to be beneficial in improving communications and document transfer between project participants. However, the challenge of integrating point-of-production workers into such systems still remains largely unrealised. This paper describes current applications within construction that are addressing these challenges. The technologies employed vary from tablet PC's, PDA's to RFID tags. The paper examines in detail a web-based data capture and management system for piling works, utilising a site-based web server and wireless network. The system effectively allows for the expansion of existing WPMS to include construction site workers, whilst improving the management and understanding of the project in terms of quality, cost and progress. The paper also agues that improved data reliability and robustness can be achieved by integrating the point-of-production operations into corporate ICT systems.

Keywords:

DOI:

Full text: content.pdf (1,104,819 bytes) (available to registered users only)

Series: w78:2005 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.

Permission to reproduce these papers has been graciously provided by the Technische Universität Dresden.


A. Gehre, P. Katranuschkov, R. J. Scherer

Managing virtual organization processes by semantic web ontologies

Abstract: Interoperability within Virtual Organisations (VOs) is still only weakly supported by IT frameworks. Whilst service level interoperability has made remarkable progress since the emergence and the rapid growth of SOA and Grid technology in the last years, business processes – which are the driving force of each VO – still suffer distinct conceptual gaps regarding their decomposition to technical transactions. There exists no detailed approach that would allow describing technical as well as business aspects in a coherent yet flexible and extensible way. This paper presents a newly developed semantic framework that targets this requirement. The conceptual background is followed by an introduction of the developed semantic web ontologies. Based on these definitions, dedicated Ontology Services as well as a set of related end-user applications facilitating semantic technology have been designed and implemented. They are presented in the second part of the paper. Reported are results from the EU project InteliGrid (IST-004664; 2004-2007).

Keywords: semantic web, ontologies, virtual organisation, process modelling, process management

DOI:

Full text: content.pdf (973,369 bytes) (available to registered users only)

Series: w78:2007 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.


Abduh M, Skibniewski M J

Utility assessment of electronic networking technologies in construction

Abstract: Despite an explosive growth in virtually all areas of industry and commerce, Electronic Networking Technology (ENT) has only begun to make inroads into the construction industry practice. Although information exchange protocols in construction firms and on construction project sites make it difficult to take advantage of most ready-made solutions applicable in other industries, there is a significant potential of large benefits from the correctly developed and applied ENT solutions for construction firms and construction project site offices. This paper describes the ongoing research effort to determine variables related to the application of ENT protocols for the main types of construction project delivery systems and to measure the utility of ENT configurations in facilitating communication between parties involved in a construction project with respect to specific project delivery systems.

Keywords:

DOI:

Full text: content.pdf (74,489 bytes) (available to registered users only)

Series: w78:1999 (browse)
Cluster: papers of the same cluster (result of machine made clusters)
Class: class.commerce (0.026075) class.communication (0.012214) class.collaboration (0.009528)
Similar papers:
Sound: read aloud.

Permission to reproduce these papers has been graciously provided by the Research Press of the National Research Council of Canada. The support of the editors, particularly Dr. Dana Vanier, is gratefully appreciated.


Bouchlaghem D, Rezgui Y, Hassanen M, Cooper G, Rose D

IT tools and support for improved briefing

Abstract: "The briefing stage is critical to the success of construction projects, however it is widely recognised that improvements are needed in this process in order to reduce the cost and optimise quality of buildings. Briefing involves understanding the client's needs and expressing them in a way that will ensure compatibility between the client's vision of the project and the resulting product. There are problems encountered in construction briefing which involve both clients and designers. There is little guidance and support for clients, whilst designers have difficulties both in capturing clients’ needs and conveying conceptual design options to them. There is a central difficulty, associated with language, communication and the exchange of information between clients and design teams, which is now gaining widespread acknowledgement. The CoBrITe (LINK/IDAC UK funded) project argues that the construction industry has yet to exploit the potential of IT systems to assist both parties during this critical phase. This is in contrast to later stages of design and construction where computer-based techniques and systems are commonplace. The overall aim of the CoBrITe project is to improve the briefing process through more efficient and effective use of existing and emerging information technologies that can support client and design teams. The project builds on the recent IDAC 88 project: Managing the Brief as a Process of Innovation, and its five key action areas for improvement: empowering the client, managing the project dynamics, appropriate team building, appropriate visualisation techniques, and appropriate user involvement. It is driven by the needs of solving challenges within the briefing and related design process, with IT a means to an end. The project brings together a group of companies from across the construction supply chain to work together towards the above aim. The methodology comprises: -An extensive literature review on construction briefing focusing on the process of briefing, human and cultural issues, and IT applications and their role within the process. ·The integration of the recent and current projects on briefing through interviews, establishing an electronic network and holding workshops. ·The formulation of a framework of enabling technologies and their potential role in facilitating the briefing process and overcoming human and organisational constraints. ·The development of a model which will facilitate the integration of activities and information sharing in the briefing process. The proposed paper will give a comprehensive overview of the CoBrITe project, including an analysis of the briefing practices and information requirement, an initial CoBrITe Briefing Process Model, the CoBrITe system architecture, and the description of the proposed framework that integrates a set of proprietary and commercial software applications aimed at supporting the briefing process."

Keywords:

DOI:

Full text: content.pdf (319,634 bytes) (available to registered users only)

Series: w78:2000 (browse)
Cluster: papers of the same cluster (result of machine made clusters)
Class: class.roadmaps (0.015409) class.processing (0.014768) class.economic (0.012134)
Similar papers:
Sound: read aloud.

Permission to reproduce these documents have been graciously provided by Icelandic Building Research Institute. The assistance of the editor, Mr. Gudni Gudnason, is gratefully appreciated


Côté S,Trudel P,Snyder R,Gervais R

An augmented reality tool for facilitating on-site interpretation of 2d construction drawings

Abstract: Two-dimensional drawings are the only type of design document that is legally approved for construction. For large construction projects, because of the drawings’ high level of abstraction and because of the very large number of drawings, interpretation and correct understanding of drawings is identified by some construction firms as their greatest single challenge. To do the building work as designed, the builder must understand the meaning of the drawings, and this comes from establishing a visual correspondence between the abstract 2D drawings and the physical environment. Unfortunately, that correspondence may not be easy to obtain when the structure of interest is not clearly visible from the user’s position (occlusion, differences between the model and the actual building, etc.). In this paper, we propose a technique that enables the display of 2D drawings into the real world using augmented reality in a way that can overcome those kinds of limitations. The tool enables users to browse the real world in search of drawings, or to request the real location that a specific drawing represents, and to view each drawing within a context composed of a combination of captured photographic reality and designed virtual modeling. Augmentation is achieved by displaying the drawing using either an animated sliding plane that shows it being inserted into the real building, or a clipping technique that displays the drawing inside a clipped 3D model which in turn is inside the real building. The 2 techniques were implemented and tested in a situation where section drawings are visualized from the outside of the building. Our results show that those visualization techniques provide good 3D perception in a representation that is easy to understand visually. They also enable quick localization of the drawing in its environment, and provide a better understanding of the drawing with respect to its context: the 3D model and the built environment.

Keywords: Augmented reality,panorama,construction,2D drawings,design,3D model

DOI:

Full text: content.pdf (1,262,789 bytes) (available to registered users only)

Series: convr:2013 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.


D. Ilter & A. Dikbas

A review of the artificial intelligence applications in construction dispute resolution

Abstract: It is generally acknowledged that construction disputes are inevitable, highly complicated and may become destructive in construction projects. Artificial Intelligence (AI) applications have been developed recently with the aim of facilitating dispute resolution processes in construction as AI have become more specialized. In this paper, contemporary AI applications in construction dispute resolution field are analyzed and categorized into three groups as settlement oriented systems, method selection oriented systems and dispute evaluation oriented systems, reviewing the tools used in each category so far. This analysis is expected to contribute to the further development of the subject, by providing a holistic perspective and determining the trends and neglected areas in the field.

Keywords:

DOI:

Full text: content.pdf (40,033 bytes) (available to registered users only)

Series: w78:2009 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.


Drogemuller R M, Smith J

Integrating the building procurement process using knowledge based technology

Abstract: Computer based methods for facilitating building procurement have been proposed for over twenty years, but progress on such systems has been slow. This paper describes a project built around a three dimensional computer model of the building to be constructed, Knowledge based techniques are used to build up the level of detail required at each stage of development. Data entry requirements are minimised since only the information unique to the project need be entered. Standard information is stored as default values from previous similar projects. The user interface is simple, with a combination of menus to control the flow of information and dialogues to enter textual information. An ‘intelligent’ CAD interface is used to enter the building geometry. The system has been developed around the design and construction of detached houses, but the principles demonstrated are relevant across the standard building types. In its current form the user can access the geometric and spatial parameters of the building, derive costing data and perform thermal analyses. There is an option to export scheduling information to an eaernal CPM program. This furnishes the basis for planning the construction activities. The flexibility of the system indicates that knowledge based systems are a viable technology for assisting construction management.

Keywords: knowledge based systems; knowledge based estimating; multi-expert system; geometric reasoning; Prolog

DOI:

Full text: content.pdf (594,574 bytes) (available to registered users only)

Series: w78:1993 (browse)
Cluster:
Class:
Similar papers:
Sound: read aloud.

Permission to reproduce these papers has been graciously provided by the National University of Singapore. The assistance of the editors, particularly Prof. Martin Betts, is gratefully appreciated.


Hammad, Amin and Motamedi, Ali

Framework for Lifecycle Status Tracking and Visualization of Constructed Facility Components

Abstract: Four-dimensional (4D) models link 3D construction models with schedule data. The visual representation of the schedule is capable of facilitating decision making during the planning and construction phases as well as the maintenance phase. However, the process of conventional data collection methods for progress monitoring is labour intensive, time consuming and error-prone; therefore, updating the virtual model based on status information is not practical. In this research, we propose a framework for lifecycle status tracking and visualization of constructed facility components using Radio Frequency Identification (RFID) technology. The proposed approach facilitates and enhances the process of data acquisition not only during the construction phase, but also during the subsequent maintenance phase. The components of the facility are tagged after being manufactured with RFID tags that remain on the components throughout their lifecycle. Each component is scanned in several phases and data are collected. The real-time interaction between the facility and its virtual model results in automatic creation of an accurate 4D model which can be used for progress monitoring and visual comparison of the planned schedule against the actual progress. The feasibility and challenges of the proposed framework are discussed and demonstrated using a prototype system and a real-world case study.

Keywords: RFID, Progress Management, 4D Modeling, Lifecycle status tracking, Visualization

DOI:

Full text: content.pdf (215,709 bytes) (available to registered users only)

Series: convr:2007 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.


I.C. Wu, A. Borrmann, E. Rank, U. Beißert & M. König

A Pattern-Based Approach for Facilitating Schedule Generation and Cost Analysis in Bridge Construction Projects

Abstract: The paper presents a computational method to help in automating the generation of time schedules for bridge construction projects. The method is based on the simulation of the construction works, taking into account the available resources and the interdependencies between the individual tasks. The simulation is realized by means of the discrete-event based simulation software originally created for plant layout in the manufacturing industry. Since the fixed process chains provided there are too rigid to model the more spontaneous task sequences of construction projects, a constraint module that selects the next task dynamically has been incorporated. The input data of the constraint module is formed by work packages of atomic activities. The description of a work package comprises the building element affected, the required material, machine and manpower resources, as well as the technological pre-requisites of the task to be performed. These input data are created with the help of a 3D model-based application that enables to assign process patterns to individual building elements. A process pattern consists of a sequence of work packages for realizing standard bridge parts, thus describing a construction method which in turn represents a higher level of abstraction in the scheduling process. In the last step, the user specifies the available resources. The system uses all the given information to automatically create a proposal for the construction schedule, which may then be refined using standard scheduling software.

Keywords:

DOI:

Full text: content.pdf (384,072 bytes) (available to registered users only)

Series: w78:2009 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.


For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 show page 3 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003