Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 12

# details full text citation check to select
1. 100%; open F Schley & K-P Holz (2005) Multilevel information management in geotechnical engineering, http://itc.scix.net/cgi-bin/works/Show?w78-2005-d6-3-schley
2. 100%; open Forest Flager, John Haymaker (2007) A comparison of multidisciplinary design, analysis and optimization processes in the building construction and aerospace industries, 625 http://itc.scix.net/cgi-bin/works/Show?w78_2007_31
3. 100%; open Hengwei Wang, Jiarui Lin and Jianping Zhang (2017) Operation-Level 4D Modeling and Visualization for Modular Building Based on Standard Activity Library, Lean and Computing in Construction Congress (LC3): Volume I Ğ Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 841-848 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-287
4. 100%; open Jason Lucas, Walid Thabet, Poonam Worlikar (2007) Using virtual reality (VR) to improve conveyor belt safety in surface mining, 431 http://itc.scix.net/cgi-bin/works/Show?w78_2007_42
5. 100%; open M. Krafczyk, T. Fahrig, J. Tölke, A. Niggl, E. Rank, A. Lähr and K.U. Bletzinger (2006) A Generalized Product-Model Based Framework For Multidisciplinary Interactive Sensitivity Analysis And Optimization In Civil Engineering, Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June http://itc.scix.net/cgi-bin/works/Show?w78-2006-tf199
6. 100%; open Pantouvakis J P (1988) Software tools for the implementation of relational databases describing the building product, Christiansson P, Karlsson H (ed.); Conceptual modelling of buildings. CIB W74+W78 seminar, October, 1988. Lund university and the Swedish building centre. CIB proceedings 126 http://itc.scix.net/cgi-bin/works/Show?w78-1988-147
7. 100%; open Raimar J.Scherer, Wael Sharmak (2008) Generic Process Template Description for the Effect of Risks on Project Schedule, CIB W78 2008 - Improving the management of construction projects through IT adoption http://itc.scix.net/cgi-bin/works/Show?w78-2008-5-02
8. 100%; open Semenov V,Anichkin A,Morozov S,Tarlapan O,Zolotov V (2013) Effective project scheduling under workspace congestion and workflow disturbance factors, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-25
9. 100%; open Thomas J R, Worling J (1992) SGML and Office Document Management Systems: Tools for Building Code Writers, Vanier D, Russell T (ed.); Computers and information in construction; Montreal, May, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1992-411
10. 100%; open U Gökçe, H U Gökçe, R J Scherer (2011) The Construction Management Phases for Software Interoperability , Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-105

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003