Aalami F, Fischer M

Joint product and process model elaboration based on construction method models

Abstract: In practice, construction planners need to plan and replan projects at several levels of detail and would like create 4D visualizations to communicate construction schedules. The current construction planning and scheduling process is , however, still largely manual and time-consuming, making it difficult to maintain an appropriate and realistic set of plans, schedules, and 4D visualizations throughout design and construction. Researchers have demonstrated the usefulness of a product model with a decomposition hierarchy and supported-by relationships between project components to generate a construction process model automatically. The product model's decomposition hierarchy supports the generation of hierarchical activities, and the supported-by relationships between components enable automated reasoning. However, the resulting process model is typically not a usable or realistic construction schedule, since activities can only be sequenced if elaborated to the same level of detail, and component-based activity elaboration is limited to the original product model. This paper discusses how a customizable and general representation of construction method models supports the transformation of a design-centric product model into a production-centric view. A formalized hierarchical construction planning process forms the basis of this translation process. The planning process is broken down into method-driven elaboration and hierarchical planning and scheduling steps. User-defined and user-selected construction method models drive the elaboration process by supplying the necessary activity and component elaboration knowledge. The product model undergoes a transformation from a design-centric decomposition to a production-centric decomposition. The elaborated activities are sequenced based on constraints that are passed on to the activities from their construction methods. The output of the planning process is a 4D production model. A 4D production model is a linked representation of an elaborated product and process models. A 4D production model is a flexible representation of the construction process that can support many views for communication and evaluation, e.g., 4D visualization, CPM-network, barchart, or resource histograms.

Keywords:

DOI:

Full text: content.pdf (289,626 bytes) (available to registered users only)

Series: w78:1998 (browse)
Cluster: papers of the same cluster (result of machine made clusters)
Class: class.represent (0.035804) class.processing (0.027755) class.communication (0.018300)
Similar papers:
Sound: read aloud.

Permission to reproduce these papers has been graciously provided by Royal Institute of Technology, Stockholm, Sweden. The assistance of the editors, Prof. Bo-Christer Bjrk and Dr. Adina Jgbeck, is gratefully appreciated.


Adel Francis, and Edmond Miresco

Toward A New Generation Of Construction Management Software

Abstract:

Keywords:

DOI:

Full text: content.pdf (421,144 bytes) (available to registered users only)

Series: w78:2006 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.


Ageliki Valavanoglou, Danijel Rebolj and Detlef Heck

Construction Delay and Disruption Claims Assisted Through BIM Technology

Abstract: Construction projects are frequently subjected to delay and disruption leading to dispute between project participants regarding the entitlement to compensation. Challenges associated with the analysis of delay and disruption and the subsequent preparation of the claim conducted by a forensic analysis expert include the difficult retrieval of scattered, unstructured information and lack of adequate documentation, leading to weak analysis and therefore insufficient proof of causation and entitlement.This paper illustrates the chronological information generation regarding delay and disruption in the construction phase proposing a framework based on Building Information Modelling and structured information integration, to facilitate easy filing and retrieval of relevant documentation for claim preparation.

Keywords: Delay and Disruption Claims, Documentation, Forensic Analysis, Building Information Modelling, BIM Collaboration Format

DOI: https://doi.org/10.24928/JC3-2017/0192

Full text: content.pdf (2,026,714 bytes) (available to registered users only)

Series: jc3:2017 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.


Agger K

Facilities management IT tools: building model, basic information and graphics

Abstract: The need for small easy to use Facilities Management IT tools for the existing building stock has led to the development of IokalEjdlnFo a windows based managementhnformation system with graphical navigation. The first version is in use in public institutions and the second version is under consideration among a broad group of FM experts in DK. IokalEjdlnFo has been implemented as a database system with graphicdCAD added on. The paper will discuss the building model used in the system, the sufficient model for FM in comparison with the necessary CAD model for building and the possibilities for extracting the FM building model from the CAD model. Basic information on the property is extracted from public databases and is used for automated generation of part of the objects in the building model. Graphic information is extracted from CAD models of the building or created from scanned drawings by the means of simple CAD tools added to the database tool as extensions. Graphics are used for graphic navigation in the model, for extracting quantities and for presentation of information. The paper discuss strategies for FM and CAD.

Keywords:

DOI:

Full text: content.pdf (1,174,117 bytes) (available to registered users only)

Series: w78:1994 (browse)
Cluster: papers of the same cluster (result of machine made clusters)
Class: class.synthesis (0.036948) class.man-software (0.031639) class.communication (0.011701)
Similar papers:
Sound: read aloud.

Permission to reproduce these papers has been graciously provided by VTT, Espoo, Finland.


Agger K

Geneobjectclases in construction IT

Abstract: The Geno project intent to participate in the development of the next generation of construction IT systems. Goals for this research should be to: * loose the design process from the production of design documents * free the geometry from orthogonal projection * make possible a full, variable, complete detailing without loosing consistency * move the development of building component specific IT modeling * tools closer to the end user * improve the efficiency and capability of these modeling tools The Geno project works with three developer / user layers: * GenoObjectClasses, the basic standardized data and functional structure, developed by IT specialists in a close dialog with the IAI IFC development. * ProtoObjectClasses: IT tools for modeling spaces, construction elements and parts. Developed by IT specialized architects,engineers, on the bases of Genotypes. Made available to the end user through Internet by component vendors. * PhenoObjects: spaces, construction elements and parts, specified, dimensioned and placed and interrelated by the designer, to be analyzed and supply project information for all participants in the construction and management process. Modeling, analyzing and information seeking and presentation done by Prototypes. The idea of this structure is to improve dynamic and user influence in IT modeling tool development. The standardized class structure for this, the GenoObjectClasses has to support three concurrent models, namely the: * SpaceModel, an interrelated surface model, a non detailed division of the project space in functional spaces (living room, kitchen,bath etc.) and construction spaces (foundation, wall, roof, slap etc.). * ComponentModel, a successive partitioning, ore filling theSpaceModel with building elements, components (facing wall, inner wall, insulation, window, door, ceiling, roof construction, inventory, furniture etc.), interrelated and related to the SpaceModel. * EntityModel, a similar fill to the Componentmodel with buildingparts (brick, joint, plaster, fitting, gutter etc.) to make a complete consistent productmodel possible. The "three model structure" to be filled out successively, add flexibility to the designprocess. When calculations and visualizations is performed the detailed model is used, but in areas with no detailing the model on the lower detailing level is used. This means that the total model will be "complete", if only the SpaceModel has been modeled. The development of GenoObjectClases will build as close as possible on IFC, and seek to expand IFC where it is nessesary. Status for the Geno project is that implementation has been started with AutoCAD ObjectARX.

Keywords:

DOI:

Full text: content.pdf (79,484 bytes) (available to registered users only)

Series: w78:1998 (browse)
Cluster: papers of the same cluster (result of machine made clusters)
Class: class.man-software (0.026583) class.represent (0.015546) class.synthesis (0.015011)
Similar papers:
Sound: read aloud.

Permission to reproduce these papers has been graciously provided by Royal Institute of Technology, Stockholm, Sweden. The assistance of the editors, Prof. Bo-Christer Bjrk and Dr. Adina Jgbeck, is gratefully appreciated.


Akbas R, Fischer M, Kunz J, Schwegler B

Use of domain knowledge, product models and geometric algorithms for generation of construction zones

Abstract: We present a layered approach for automated generation of construction zones from 3D CAD models for construction planning and scheduling. The existence of 3D models and product models provides an opportunity for planners and schedulers to consider zoning alternatives and represent and visualize production information in detail. Construction zones are spaces, or groups of spaces, which serve as units of work in the construction planning process. Failure to define construction zones properly may increase overall project duration and impact workflow adversely. Today, zone definitions are generally ad-hoc. Formal definitions and mechanisms to generate construction zone information are not available in commercially available software.We have defined a three-layer computational framework in a prototype construction management software tool to generate detailed information about construction zones. The framework separates the construction-based information from the product model representation and geometric information. Each layer is extensible and testable without the other layers. The highest layer (Layer3) contains domain knowledge about zones, i.e., types of zones and factors or constraints affecting construction zone definition. For example, a shape factor takes into account the changes in production rates due to local variations of geometry. The shape factor also allows the representation of an idle crew because of a nearby activity, missing support or unavailability of materials. Layer 2 manages the changes in the product and process models that are necessary to generate zones. Additionally, it uses zoning knowledge to maintain consistent schedules at multiple levels of detail. Layer 1 is the geometric level that contains the geometric algorithms to create the subdivisions and aggregations using the geometric shape representation of the building components. Instead of considering a fixed geometric representation for a component, we provide a flexible triangular mesh shape representation, breaking-up or aggregating component geometry as necessary. With the results of this research, professionals will be able to simulate and visualize construction processes more accurately and link design and construction data more tightly to explore design-build scenarios rapidly and communicate them effectively.

Keywords:

DOI:

Full text: content.pdf (1,076,021 bytes) (available to registered users only)

Series: w78:2001 (browse)
Cluster: papers of the same cluster (result of machine made clusters)
Class: class.impact (0.028985) class.environment (0.026386) class.represent (0.022098)
Similar papers:
Sound: read aloud.

Permission to reproduce these documents have been graciously provided by CSIR Building and Construction Technology. The assistance of the editors, Mr. Gustav Coetzee and Mr. Frances Boshoff, is gratefully appreciated.


Al-Ghassani A M, Kamara J M, Anumba C J, Carrillo P M

A tool for developing knowledge management strategies

Abstract: While organisations recognise that Knowledge Management (KM) is essential for improving performance, many have difficulties in developing strategies for implementation. The nature of knowledge is of particular complexity in organisations such as those within the construction industry characterised by temporary 'virtual' organisations formed for the completion of projects. A significant proportion of construction organisations realise the benefits of KM but most remain at the infancy stages of developing and implementing KM strategies. This paper identifies the need for a methodology to help organisations establishing these strategies. It then describes a framework developed within the CLEVER (Cross-sectoral Learning in the Virtual Enterprise) project at Loughborough University. The framework introduces a methodology that supports KM at both the tactical and strategic levels in order to aid organisations, especially in the construction and manufacturing industries, in developing KM strategies. The methodology was encapsulated into a prototype software system to achieve a simpler format and is easier to use. Industrial collaborators evaluated both the paper format and the prototype software and it is evident that the developed methodology has the potential to provide a very useful way for developing KM strategies and that very little exists elsewhere to assist companies in developing KM strategies in this way. The software prototype was seen as an important enhancement to the paper version. The inviting format, simplified guidance, reduced input duplication, and automated report generation were found the most significant enhancements. The focus of this paper is on the development and operation of the prototype. Its key benefits and lessons learned in implementing it are highlighted in the paper.

Keywords: Construction organisations, knowledge management, KM strategies, software prototype.

DOI:

Full text: http://www.itcon.org/2002/5 (available to registered users only)

Series: itcon:2002 (browse)
Cluster:
Class:
Similar papers:
Sound: read aloud.


Alain Zarli, Eric Pascual, Daniel Cheung

Information and Communication Technology for Intelligent and Integrated Controls in Buildings: Current Developments and Future Research

Abstract: A common and acknowledged vision today is the one that, in the future, buildings, along with their components, equipments, and their environment will communicate and be able to provide information on their status ubiquitously. This real-time available information will be interoperable via common protocols for holistic automation & control. The whole building will be supervised by intelligent systems, able to combine information from all connected devices, from the Internet or from energy service providers in order to efficiently control HVAC (heating & cooling), lighting, and hot water systems along with energy production, storage and consumption devices inside the building, taking into account the users' needs and wishes. In such a context, ICT is recognised as key for empowering people in the (built) universe in which they live, with smart e-metering and new smart e-devices – as well as becoming fully pervasive in the future optimization of energy in the built environment - where “Energy-efficient smart buildings” are to be buildings which contain systems that manage information for an optimal operation of building energy flows over the whole building lifecycle.In such a context, CSTB has developed an open framework for data collection and processing, to be installed in any built environment. It supports networked heterogeneous sensors and actuators (with appropriate communication protocols technology), allows assembling various “business” functions (with easy evolution and extension capability thanks to a concept of service composition and event-driven management between modules), can accommodate any hardware platform constraint (memory, computing power), and can be executed in any environments supporting a Java SE implementation. The framework is itself based on an OSGi platform. The notion of “sensor” is to be considered in a comprehensive way: physical sensor (analogic or logic), complex sub-system or meta-sensor (e.g. Agilent data acquisition system or alike), or even external services (e.g. getting weather data via the Internet). Fields of applications are energy-efficiency in the built environment, but also Ambient-Assisted Living (AAL), internal air quality assessment, collection of data related to inhabitants behaviours, etc..The REEB coordination action (European strategic research roadmap to ICT enabled Energy-Efficiency in Buildings and construction), as a European R&D technology roadmap initiative (achieved in the context of an EC-funded Coordinated Action - http://www.ict-reeb.eu) has identified ICT contributions to the energy efficiency of buildings mainly via improvement (and corresponding RTD) in integrated design (and indeed ICT tools for Energy-Efficient design and production management), integrated and intelligent control, user awareness and decision support to various stakeholders throughout the whole life of buildings, energy management and trading, and integration technologies. As far as the integrated / intelligent control field is concerned, REEB has fundamentally identified the following areas for future investigation:• automation & control: system concepts, intelligent HVAC, smart lighting, ICT for micro-generation & storage systems, predictive control;• monitoring: instrumentation: smart metering;• quality of service: improved diagnostics, secure communications;• wireless sensor networks: hardware, operating systems, network design.The paper will first introduce to expectations, requirements and potential future scenarios for ICT to support integrated and optimised control in future so-called smart buildings. It will then introduce to the current trend of developments at CSTB in this area, and will present the CSTBox as a tool federating and/or complementing functions (potentially relying on already installed systems) in the built environment. After a short presentation of the REEB project, the paper will follow up with exhibiting the outcome of the REEB project in terms of roadmapping RTD activities in this technological field, also providing with a first insight of their potential impact in the future.Acknowledgement: the authors wish to thank the European Commission (DG INFSO) for its financial support to the REEB co-ordinated action. Moreover, the authors are also grateful to the REEB Consortium partners, namely ARUP, ACCIONA, CEA, LABEIN, TUD, UCC & VTT.

Keywords: Energy-efficient buildings, Intelligent and Integrated Control, REEB project, CSTBox framework, Data collection and storage

DOI:

Full text: content.pdf (557,833 bytes) (available to registered users only)

Series: w78:2010 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.


Anders Vennstrom, Thomas Olofsson, William Fawcett, Attila Dikbas, Esin Ergen

Determination and Costing of Sutainiable Construction Projects: Option Based Decision Support

Abstract: The building stock in Europe accounts for over 40% of the final energy consumption in the European Union. Moreover, the construction sector is one of the largest producers of industrial waste contributing 40-50% of landfill in some EU countries. A common way of creating a forward planning for optimal resource efficiency in construction project is to apply Life cycle cost (LCC) and Life Cycle Assessment (LCA) in the decision process. There are, however, difficulties in assessment of the impact of the whole project on the environment and estimating its sustainability. The EU funded 7th framework project CILECCTA sets out to develop a LCCA (Life Cycle Cost and Analysis) tool supporting the determination and costing of sustainable project strategies.Current LCC software can assist the decision making process in simulating different alternatives for the design, build, maintenance and demolition of assets – allowing both client and builder to determine the favoured alternative for them. Through linking LCC and LCA methodologies, the CILECCTA project will go one stage further by enabling an assessment of the impact of the whole project on the environment and estimating its sustainability. It will also include the recently developed new generation of Whole Life Costing (WLC) methodology including a probabilistic approach to the development of sustainable WLC strategies, using a real options approach. This paper sets out the framework of current LCCA tools and the challenges in developing a modular LCCA engine integrating asset-related data in price banks and life cycle inventories across Europe. The research leading to these results has received funding from the European Community's Program FP7/2007-2013 under grant agreement no 229061.

Keywords: Decision support, Life Cycle Cost, Life Cycle Assessment, real option analysis

DOI:

Full text: content.pdf (116,904 bytes) (available to registered users only)

Series: w78:2010 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.


Augenbroe G

The combine project: a global assessment

Abstract: The outcome of the EU funded COMBINE project will be assessed. The objectives of COMBINE (Computer Models for the Building Industry in Europe) are to deliver the first examples of a future generation of intelligent integrated building design systems to engineering design practices, with the emphasis on the energy and HVAC disciplines. The objective is accomplished by embedding proven IT solutions for data integration in a system architecture that enables the information exchange among the members of a building design team. An overview of the approach of the 70 man years effort between 1990 and 1995 by a consortium of 11 R and D institutions across Europe is presented.. A global assessment of the overall approach and the use of available product data technology that have led to three prototypes of integrated building design systems is given.

Keywords:

DOI:

Full text: content.pdf (888,136 bytes) (available to registered users only)

Series: w78:1995 (browse)
Cluster: papers of the same cluster (result of machine made clusters)
Class: class.software development (0.012897) class.represent (0.011783) class.roadmaps (0.011353)
Similar papers:
Sound: read aloud.

Permission to reproduce these papers has been graciously provided by the Stanford University, USA. The support of the editors, particularly Prof. Fischer is gratefully appreciated.


For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 show page 3 show page 4 show page 5 show page 6 ... show page 12 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003