Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 22

# details full text citation check to select
1. 100%; open A Y Chen, C-H Lin (2014) Distributed Decision-Making for Real-Time In-Building Evacuation Guidance, Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 883-890 http://itc.scix.net/cgi-bin/works/Show?w78-2014-paper-110
2. 100%; open Al-Ghassani A M, Kamara J M, Anumba C J, Carrillo P M (2002) A tool for developing knowledge management strategies, Electronic Journal of Information technology in Construction, Vol. 7, pg. 69-82. http://itc.scix.net/cgi-bin/works/Show?itcon-2002-5
3. 100%; open Archer G O, Futcher K, McMahon M A (1997) Multi-participant project informationmanagement system, Drogemuller R (editor); International council for building research studies and documentation. workshop (1997, Cairns) Information technology support for construction process reengineering Proceedings of CIB workshop - w78 “Working commission on information technology in construction” and tg10 “Task group on computer representation of design standards and building codes”, Cairns, Queensland, Australia, July 9th-11th, 1997; ISBN 086-443-636X http://itc.scix.net/cgi-bin/works/Show?w78-1997-41
4. 100%; open Bouchlaghem D, Rezgui Y, Hassanen M, Cooper G, Rose D (2000) IT tools and support for improved briefing, Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000 http://itc.scix.net/cgi-bin/works/Show?w78-2000-124
5. 100%; open Casson A, Stone D (1992) An expertext system for building standards, Vanier D, Russell T (ed.); Computers and information in construction; Montreal, May, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1992-110
6. 100%; open E Hjelseth, N Nisbet (2011) Capturing normative constraints by use of the semantic mark-up RASE methodology, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-45
7. 100%; open Guillermo Aranda-Mena, John Crawford, Agustin Chevez, Thomas Froese (2008) BUILDING INFORMATION MODELLING DEMYSTIFIED: DOES IT MAKE BUSINESS SENSE TO ADOPT BIM?, CIB W78 2008 - Improving the management of construction projects through IT adoption http://itc.scix.net/cgi-bin/works/Show?w78-2008-5-01
8. 100%; open Haksever A M (2000) A model to predict the occurrence of information overload of project managers, Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000 http://itc.scix.net/cgi-bin/works/Show?w78-2000-415
9. 100%; open Hee-Sung Cha, Kyungrai Kim, Dong-Woo Shin (2008) DEVELOPMENT OF 5D-CAD BASED WORK PROCESS MODEL FOR AGED-HOUSING REVAMP PROJECTS, CIB W78 2008 - Improving the management of construction projects through IT adoption http://itc.scix.net/cgi-bin/works/Show?w78-2008-2-02
10. 100%; open Howard R (1988) Modelling buildings anti classifying data in cad systems, Christiansson P, Karlsson H (ed.); Conceptual modelling of buildings. CIB W74+W78 seminar, October, 1988. Lund university and the Swedish building centre. CIB proceedings 126 http://itc.scix.net/cgi-bin/works/Show?w78-1988-189

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 show page 3 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003