Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 9 of 9

# details full text citation check to select
1. 100%; open   A Redmond, A Hore, R West, J Underwood, M Alshawi (2011) Developing a Horizontal Integrated Life Cycle Costing Analysis Model through BIM , Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-11
2. 100%; open Chang Hak, Kim; Leen Seok, Kang; Sang Bok, Jee (2006) 4D System for Visualizing Schedule Progress of Horizontal Construction Project Including Earthwork, http://itc.scix.net/cgi-bin/works/Show?85cf
3. 100%; open   Kilar V (1997) Computer program for linear and nonlinear analysis of tall buildings subjected to horizontal loading , Sarja A (editor); Computers in the practice of building and civil engineering, Worldwide ECCE symposium; September 3-5, 1997, Finland http://itc.scix.net/cgi-bin/works/Show?ecce-1997-274
4. 100%; open Llorenc Mejino, Llorenc Guilera (1988) Integral treatment system for construction elements.SITEC project. classification structure, Christiansson P, Karlsson H (ed.); Conceptual modelling of buildings. CIB W74+W78 seminar, October, 1988. Lund university and the Swedish building centre. CIB proceedings 126 http://itc.scix.net/cgi-bin/works/Show?w78-1988-241
5. 100%; open Murray M, Lai A (2001) The management of construction projects using web sites, Symposium Report on the 2nd Worldwide ECCE Symposium. Information and Communication Technology in the Practice of Building and Civil Engineering, RIL - Association of Finish Civil Engineers; VTT - Technical Research Centre of Finland, Building Technology, 6-8 June 2001, Espoo, Finland. http://itc.scix.net/cgi-bin/works/Show?ecce-2001-29
6. 100%; open S Taneja, B Akinci,J H Garrett, L Soibelman, B East (2011) BIM-BASED HYBRID INERTIAL POSITIONING FOR FACILITY OPERATIONS SUPPORT, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-62
7. 100%; open Semenov V,Anichkin A,Morozov S,Tarlapan O,Zolotov V (2013) Effective project scheduling under workspace congestion and workflow disturbance factors, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-25
8. 100%; open Yang Y Q, Wang S Q, Low S P, Goh B H (2003) Adaptations of QFD for constructable designs within a concurrent construction environment: an information modeling approach, Amor R (editor) Proceedings of the CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284, ISBN 0-908689-71-3, Waiheke Island, New Zealand, 23-25 April 2003, pg. 479-489. http://itc.scix.net/cgi-bin/works/Show?w78-2003-479
9. 100%; open Yusin Lee and Hsiao-Liang Liu (2006) An Optimization Heuristic For The Highway Horizontal Alignment Problem, Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June http://itc.scix.net/cgi-bin/works/Show?w78-2006-tf140

No more hits.

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003