Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 21 to 30 of 74

# details full text citation check to select
21. 100%; open Euthimios Glymis, Athanasios Kanelakis, Georgios Aretoulis and Theodoros Mastoras (2017) Predicting Highway Projects' Actual Duration Using Neural Networks, Lean and Computing in Construction Congress (LC3): Volume I Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 691-697 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-260
22. 100%; open Georgios Nektarios Lilis, Kyriakos I. Katsigarakis, Georgios I. Giannakis and Dimitrios Rovas (2017) A Cloud-Based Platform for IFC File Enrichment with Second-Level Space Boundary Topology, Lean and Computing in Construction Congress (LC3): Volume I Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 255-262 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-284
23. 100%; open H. Hofmeyer, M. C. M. Bakker (2007) Positioning FEM in the transformation of spatial design to structural design, 515 http://itc.scix.net/cgi-bin/works/Show?w78_2007_33
24. 100%; open Howard R W (1999) Reverse propagation of data for building management, Lacasse M A, Vanier D J (ed.); Information technology in construction, volume 4, ISBN 0-660-17743-9; Vancouver, May 30 - June 3, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1999-2696
25. 100%; open I.C. Wu, A. Borrmann, E. Rank, U. Beiert & M. Knig (2009) A Pattern-Based Approach for Facilitating Schedule Generation and Cost Analysis in Bridge Construction Projects, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-18
26. 100%; open Jason Lucas, Poonam Worlikar, Walid Thabet (2008) AN EVALUATION SCHEME FOR TWO SAFETY TRAINING APPLICATIONS, CIB W78 2008 - Improving the management of construction projects through IT adoption http://itc.scix.net/cgi-bin/works/Show?w78-2008-1-05
27. 100%; open Jiwen Zhang, Tim Taylor, Roy Sturgill, Gabe Dadi and Nikiforos Stamatiadis (2017) Predictive Risk Modeling of Differential Bridge Settlement, Lean and Computing in Construction Congress (LC3): Volume I Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 145-152 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-060
28. 100%; open Joao Patacas, Huda Dawood and Nashwan Dawood (2017) Reality Capture and Visualisation of 3D Oil & Gas Facility Data for Operations and Decommissioning, Lean and Computing in Construction Congress (LC3): Volume I Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 201-208 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-285
29. 100%; open K F Ibrahim, F H Abanda, C Vidalakis, G Woods (2016) BIM for FM: Input versus Output data, Proceedings of the 33rd International Conference of CIB W78, Brisbane, Australia, 31 October - 2 November http://itc.scix.net/cgi-bin/works/Show?w78-2016-paper-051
30. 100%; open   Kaivonen J A (1997) Method for calculating ecological balances, Sarja A (editor); Computers in the practice of building and civil engineering, Worldwide ECCE symposium; September 3-5, 1997, Finland http://itc.scix.net/cgi-bin/works/Show?ecce-1997-149

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
show page 1 show page 2 this is page 3 show page 4 show page 5 show page 6 show page 7 show page 8 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003