Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 8 of 8

# details full text citation check to select
1. 100%; open C Lee, J Kang, B Wuensche, R Amor (2013) MyInterior: AR Supporting Interior Design, Proceedings of the 30th International Conference of CIB W78, Beijing, China, 19-12 October, 574-583 http://itc.scix.net/cgi-bin/works/Show?w78-2013-paper-90
2. 100%; open Charles Woodward, Jani Lahti, Jukka Rönkkö, Petri Honkamaa, Mika Hakkarainen, Jani Jäppinen, Kari Rainio, Sanni Siltanen, Jouko Hyväkkä (2007) Case digitalo – a range of virtual and augmented reality solutions in construction application, 529 http://itc.scix.net/cgi-bin/works/Show?w78_2007_23
3. 100%; open Cheng J,Deng Y,Du Q (2013) Mapping between BIM models and 3d GIS city models of different levels of detail, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-50
4. 100%; open Ekaterina Petrova, Mai Brink Rasmussen, Rasmus Lund Jensen and Kjeld Svidt (2017) Integrating Virtual Reality and BIM for End-User Involvement in Design: A Case Study, Lean and Computing in Construction Congress (LC3): Volume I Š Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 699-706 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-266
5. 100%; open Elham Delzendeh and Song Wu (2017) The Influence of Space Layout Design on OccupantÕs Energy Behaviour, Lean and Computing in Construction Congress (LC3): Volume I Š Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 601-608 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-235
6. 100%; open Haghighat F (2003) Development of a procedure to evaluate the air leakage distribution from fan pressurization test - validation of three airflow models, Amor R (editor) Proceedings of the CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284, ISBN 0-908689-71-3, Waiheke Island, New Zealand, 23-25 April 2003, pg. 137-145. http://itc.scix.net/cgi-bin/works/Show?w78-2003-137
7. 100%; open Mahmoud Reda Taha, Kyoung Kyu Choi, and Alaa Sherif (2006) Predicting The Punching Shear Strength Of Interior Slab-Column Connections Using Fuzzy Systems, Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June http://itc.scix.net/cgi-bin/works/Show?w78-2006-tf207
8. 100%; open Schevers H, Tolman F (2001) Creating a virtual project environment for the first building life cycle stages with cost and value evaluations, Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2 http://itc.scix.net/cgi-bin/works/Show?w78-2001-13

No more hits.

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003