Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 33

# details full text citation check to select
1. 100%; open A Lähr & K-U Bletzinger (2005) Prediction of consequences for planning situation based decisions, http://itc.scix.net/cgi-bin/works/Show?w78-2005-a2-1-laehr-reg
2. 100%; open Bakkeren W, Willems P (1993) Capturing and structuring the meaning of communication in the building and construction industry, Mathur K S, Betts M P, Tham K W (editors); Management of information technology for construction; Singapore, August 1993 http://itc.scix.net/cgi-bin/works/Show?w78-1993-2-435
3. 100%; open Côté S,Trudel P,Snyder R,Gervais R (2013) An augmented reality tool for facilitating on-site interpretation of 2d construction drawings, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-32
4. 100%; open Danner W F, Yang Y, Reed K A (1992) STEP integration and interpretation methods, Vanier D, Russell T (ed.); Computers and information in construction; Montreal, May, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1992-165
5. 100%; open Daum S,Borrmann A (2013) Checking spatio-semantic consistency of building information models by means of a query language, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-49
6. 100%; open Dawood, Nash and Sikka, Sushant (2007) Measuring the Effectiveness of 4D Planning as a Valuable Communication Tool, 7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 198-205. http://itc.scix.net/cgi-bin/works/Show?bd6c
7. 100%; open Drogemuller R, Woodbury R, Crawford J (2000) Extracting representation from structured text: initial steps, Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000 http://itc.scix.net/cgi-bin/works/Show?w78-2000-302
8. 100%; open F. Peterson, M. Fischer and T. Wingate, O. Seppänen, T. Tutti & R. See (2009) Teaching Integrated Scope-Cost Methods with Model-based Tools, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-28
9. 100%; open Gielingh W (1988) General AEC reference model (GARM) an aid for the integration of application specific product definition models, Christiansson P, Karlsson H (ed.); Conceptual modelling of buildings. CIB W74+W78 seminar, October, 1988. Lund university and the Swedish building centre. CIB proceedings 126 http://itc.scix.net/cgi-bin/works/Show?w78-1988-165
10. 100%; open Hegazy T, Moselhi O, Fazio P (1993) Managing construction knowledge in patterns: a neural network approach, Mathur K S, Betts M P, Tham K W (editors); Management of information technology for construction; Singapore, August 1993 http://itc.scix.net/cgi-bin/works/Show?w78-1993-2-331

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 show page 3 show page 4 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003