Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 11 to 20 of 65

# details full text citation check to select
11. 100%; open Ayer S,Messner J,Anumba C (2013) ecoCampus: a new approach to sustainable design education, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-34
12. 100%; open B de Vries (2001) Building management simulation center, Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2 http://itc.scix.net/cgi-bin/works/Show?w78-2001-9
13. 100%; open B. Omar, S. Abu Hassan & T. Ballal (2009) Exploring Context-Awareness in the construction logistics services delivery, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-44
14. 100%; open Bergsten S, Knutsson M (2001) 4D CAD- an efficient tool to improve production method for integration of apartments in existing buildings, Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2 http://itc.scix.net/cgi-bin/works/Show?w78-2001-2
15. 100%; open Blackmore J M (1993) Computer aided development of knowledge in the construction process, Mathur K S, Betts M P, Tham K W (ed.); Pre-proceedings of the first international conference on the management of information technology for construction; Singapore, August 1993 http://itc.scix.net/cgi-bin/works/Show?w78-1993-3
16. 100%; open Boshoff N, Coetzee G (1998) The use of electronic commerce in the materials procurement in SA construction industry, Bjork B C, Jagbecj A (ed.); The life-cycle of construction IT innovations. - Technology transfer from research to practice. [ Conference Proceedings / ISBN 91-7171-281-4] Stockholm (Sweden) 3-5 June 1998 http://itc.scix.net/cgi-bin/works/Show?w78-1998-15
17. 100%; open BŁgler M,Dori G,Borrmann A (2013) Swap based process schedule optimization using discrete-event simulation, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-24
18. 100%; open   Costin A,Shaak A,Teizer J,Pfeffer G,Khanzode A,Saripally D,Chao O,Schoner B,Shah S (2013) Passive RFID-based asset tracking and project management on a large hospital project, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-22
19. 100%; open D. Grau, C. H. Caldas, C.T. Haas, P.M. Goodrum & J. Gong (2009) Leveraging Materials Tracking Technologies to Improve Industrial Project Performance, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-12
20. 100%; open D. Grau (2009) Characterizing the Non-Value-Added Relocation of Non-Bulk Components on Storage Yards, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-15

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
show page 1 this is page 2 show page 3 show page 4 show page 5 show page 6 show page 7 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003