Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 91 to 100 of 119

# details full text citation check to select
91. 100%; open Rischmoller L, Fischer M, Fox R, Alarcon L (2000) Impact of computer advanced visualization tools in AEC industry, Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000 http://itc.scix.net/cgi-bin/works/Show?w78-2000-753
92. 100%; open Robert-Nicoud Y, Raphael B, Smith I (2000) Decision support through multiple models and probabilistic search, Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000 http://itc.scix.net/cgi-bin/works/Show?w78-2000-765
93. 100%; open Sariyildiz S (2001) ICCT influence on spatial planning, design and construction process, Symposium Report on the 2nd Worldwide ECCE Symposium. Information and Communication Technology in the Practice of Building and Civil Engineering, RIL - Association of Finish Civil Engineers; VTT - Technical Research Centre of Finland, Building Technology, 6-8 June 2001, Espoo, Finland. http://itc.scix.net/cgi-bin/works/Show?ecce-2001-36
94. 100%; open Schevers H, Tolman F (2001) Creating a virtual project environment for the first building life cycle stages with cost and value evaluations, Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2 http://itc.scix.net/cgi-bin/works/Show?w78-2001-13
95. 100%; open Scott D, Jianli H (1995) A knowledge-base system for joint-venture projects in china, Fischer M A, Law K H, Luiten B(ed.); Modelling of buildings through their life-cycle; Stanford, August 1995 http://itc.scix.net/cgi-bin/works/Show?w78-1995-392
96. 100%; open Shiratuddin M F, Thabet W (2003) A framework for a collaborative design review system utilizing the unreal tournament (UT) game development tool, Amor R (editor) Proceedings of the CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284, ISBN 0-908689-71-3, Waiheke Island, New Zealand, 23-25 April 2003, pg. 310-318. http://itc.scix.net/cgi-bin/works/Show?w78-2003-310
97. 100%; open SM Holzer & F Geyer (2005) Resources, Time & Money: Why project schedules simply don't work, http://itc.scix.net/cgi-bin/works/Show?w78-2005-kn-w1-3-holzer
98. 100%; open Smeltzer G T-A, Roelen W, Wagter H (1991) Presentation of design models, Wagter H, Spoonamore J (ed.); The computer integrated future. CIB Seminar, 16-17 September, 1991. Eindhoven University of Technology, Calibre, The Netherlands http://itc.scix.net/cgi-bin/works/Show?w78-1991-17
99. 100%; open Soubra S, Pelletret R (1991) Intelligent simulation environments for building modeling and simulation, Wagter H, Spoonamore J (ed.); The computer integrated future. CIB Seminar, 16-17 September, 1991. Eindhoven University of Technology, Calibre, The Netherlands http://itc.scix.net/cgi-bin/works/Show?w78-1991-18
100. 100%; open Stascheit J,Meschke G,Koch C,Hegeman F,König M (2013) Process oriented numerical simulation of mechanized tunnelling using an IFC-based tunnel product model, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-61

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
show page 1 ... show page 5 show page 6 show page 7 show page 8 show page 9 this is page 10 show page 11 show page 12 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003