Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 21

# details full text citation check to select
1. 100%; open BŁgler M,Dori G,Borrmann A (2013) Swap based process schedule optimization using discrete-event simulation, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-24
2. 100%; open Chen Y, Amor R (2002) Identification and classification of A/E/C web sites and pages, Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark http://itc.scix.net/cgi-bin/works/Show?w78-2002-34
3. 100%; open   Costin A,Shaak A,Teizer J,Pfeffer G,Khanzode A,Saripally D,Chao O,Schoner B,Shah S (2013) Passive RFID-based asset tracking and project management on a large hospital project, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-22
4. 100%; open Costin, A., Sedehi, A., Williams, M., Li, L., Bailey, K., and Teizer, J. (2010) Leveraging Passive Radio Frequency Identification Technology in High-Rise Renovation Projects, CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-7
5. 100%; open Doherty P (2000) Facility knowledge environments: ebuildings, culture and technology, Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000 http://itc.scix.net/cgi-bin/works/Show?w78-2000-290
6. 100%; open E Wang, Z Shen, L Wang, N Barry (2014) Benchmarking Building Energy Performance Using Data Envelopment Analysis with Normalized Metrics - A Residential Case Study, Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 1994-2000 http://itc.scix.net/cgi-bin/works/Show?w78-2014-paper-247
7. 100%; open H Jebelli, C R Ahn, T L Stentz (2014) The Validation of Gait-Stability Metrics to Assess Construction Workers' Fall Risk, Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 997-1004 http://itc.scix.net/cgi-bin/works/Show?w78-2014-paper-124
8. 100%; open Hitchcock R J, Piette P A, Selkowitz S E (1999) A building life-cycle information system for tracking building performance metrics, Lacasse M A, Vanier D J (ed.); Information technology in construction, volume 4, ISBN 0-660-17743-9; Vancouver, May 30 - June 3, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1999-2688
9. 100%; open Leicht, Robert; Maldovan, Kurt; and Messner, John (2007) A Framework to Analyze The Effectiveness of Team Interactions in Virtual Environments, 7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 100-109. http://itc.scix.net/cgi-bin/works/Show?4be4
10. 100%; open M R A Addor, E T Santos (2015) BIM Coordination Room Layout: Assessment Criteria and Metrics, Proceedings of the 32nd International Conference of CIB W78, Eindhoven, The Netherlands, 27-29 October, 8-17 http://itc.scix.net/cgi-bin/works/Show?w78-2015-paper-001

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 show page 3 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003