Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 21 to 30 of 66

# details full text citation check to select
21. 100%; open Froese T, Grobler F (1998) Developing data standards for construction--An IAI perspective, Bjork B C, Jagbecj A (ed.); The life-cycle of construction IT innovations. - Technology transfer from research to practice. [ Conference Proceedings / ISBN 91-7171-281-4] Stockholm (Sweden) 3-5 June 1998 http://itc.scix.net/cgi-bin/works/Show?w78-1998-22
22. 100%; open Futcher K G, Rowlinson S (1998) Information-management-systems used by the Hong Kong construction industry, Bjork B C, Jagbecj A (ed.); The life-cycle of construction IT innovations. - Technology transfer from research to practice. [ Conference Proceedings / ISBN 91-7171-281-4] Stockholm (Sweden) 3-5 June 1998 http://itc.scix.net/cgi-bin/works/Show?w78-1998-23
23. 100%; open G Hamazaki, G B. Monteiro Lopes (2011) An Approach about the Modelling process to Geometric Objects with the ISO 15926 standard, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-149
24. 100%; open G Lee, Sl Ham, Y Hyun Park (2011) FRAMEWORK OF THE EXTENDED PROCESS TO PRODUCT MODELING (XPPM) FOR EFFICIENT IDM DEVELOPMENT, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-141
25. 100%; open Hauser M, Nollau C, Scherer R J (1996) Intelligent design tools as product model interfaces, Turk Z (ed.); Construction on the information highway. CIB proceedings, May, 1996 Univ. Of Ljubljana, Slovenia http://itc.scix.net/cgi-bin/works/Show?w78-1996-273
26. 100%; open Hongjo Kim, Hyoungkwan Kim, Yong Won Hong and Hyeran Byun (2017) Detection of Construction Equipment Using Deep Convolutional Networks, Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 517-524 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-335
27. 100%; open I.C. Wu, A. Borrmann, E. Rank, U. Beißert & M. König (2009) A Pattern-Based Approach for Facilitating Schedule Generation and Cost Analysis in Bridge Construction Projects, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-18
28. 100%; open Ibrahim, Manson; Jahnkassim, Puteri Shireen; Ali, Maisarah; Latip, Nurul Syala Abdul; and Abidin, NorZalifa Zainal (2007) Virtual Reality in Heritage Studies and Historical Reconstruction through Animation – A Case Study of a 16th Century University Complex in the Ottoman World, 7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 233-243. http://itc.scix.net/cgi-bin/works/Show?2c83
29. 100%; open Jakob Beetz, Bauke de Vries, Jos van Leeuwen (2007) RDF-based distributed functional part specifications for the facilitation of service-based architectures, 183 http://itc.scix.net/cgi-bin/works/Show?w78_2007_39
30. 100%; open Jeehee Lee, June-Seong Yi, Jeongwook Son and Ye-Eun Jang (2017) Pre-Bid Clarification for Construction Project Risk Identification Using Unstructured Text Data Analysis, Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 219-227 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-028

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
show page 1 show page 2 this is page 3 show page 4 show page 5 show page 6 show page 7 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003