Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 27

# details full text citation check to select
1. 100%; open Bourdeau M, Kazi, A S, Rezgui Y, Vakola M (2001) An open system for inter-enterprise information management indynamic virtual enterprises, Symposium Report on the 2nd Worldwide ECCE Symposium. Information and Communication Technology in the Practice of Building and Civil Engineering, RIL - Association of Finish Civil Engineers; VTT - Technical Research Centre of Finland, Building Technology, 6-8 June 2001, Espoo, Finland. http://itc.scix.net/cgi-bin/works/Show?ecce-2001-19
2. 100%; open C M Tam, Arthur W T Leung (2010) Using Construction Process Simulation to Assess Productivity of Laying Water Mains in Hong Kong , CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-15
3. 100%; open Cheung S O, Au-Yeung R F, Wong V W K (2004) A CBR based dispute resolution process selection system, International Journal of IT in Architecture, Engineering and Construction (IT-AEC), Volume 2, Issue 2, Rotterdam: Millpress Science Publishers http://itc.scix.net/cgi-bin/works/Show?itaec-2004-11
4. 100%; open Costa F (1992) The S:ITEC model: An integrated system of treatment of data and knowledge in construction, Vanier D, Russell T (ed.); Computers and information in construction; Montreal, May, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1992-156
5. 100%; open Diederiks H J, Van Staveren R J (1991) Dynamic information system for modeling processes, Wagter H, Spoonamore J (ed.); The computer integrated future. CIB Seminar, 16-17 September, 1991. Eindhoven University of Technology, Calibre, The Netherlands http://itc.scix.net/cgi-bin/works/Show?w78-1991-8
6. 100%; open   Dimitra Chondrogianni, Christos Gioldasis and Yorgos Stephanedes (2017) Low-Cost Fleet Management Solutions in the Framework of Emerging Markets, Lean and Computing in Construction Congress (LC3): Volume I – Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 561-570 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-180
7. 100%; open   El sheikhy R A I (1997) Crack path prediction using computer model fracture mechanics analysis , Sarja A (editor); Computers in the practice of building and civil engineering, Worldwide ECCE symposium; September 3-5, 1997, Finland http://itc.scix.net/cgi-bin/works/Show?ecce-1997-284
8. 100%; open Felix Hofmann, Volker Berkhahn (2007) Adjusting a tool for collaborative planning to requirements in practice - realisation of a client-server architecture, 325 http://itc.scix.net/cgi-bin/works/Show?w78_2007_30
9. 100%; open Flood I,Nowrouzian V (2013) Construction process modelling: a constrained graphics approach versus conventional construction simulation, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-26
10. 100%; open   Georg Ferdinand Schneider, Yashar Kalantari, Georgios D. Kontes, Gunnar Grün and Simone Steiger (2017) A Platform for Automated Technical Building Management Services Using Ontology, Lean and Computing in Construction Congress (LC3): Volume I – Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 321-328 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-279

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 show page 3 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003