Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 41 to 50 of 108

# details full text citation check to select
41. 100%; open Kanoglu A (2001) MITOS: multi-phase integrated automation systemfor building production process, Symposium Report on the 2nd Worldwide ECCE Symposium. Information and Communication Technology in the Practice of Building and Civil Engineering, RIL - Association of Finish Civil Engineers; VTT - Technical Research Centre of Finland, Building Technology, 6-8 June 2001, Espoo, Finland. http://itc.scix.net/cgi-bin/works/Show?ecce-2001-16
42. 100%; open Karstila K, Pehrsson R (1998) SteelBase - implementing product data exchange for constructional steelwork, Bjork B C, Jagbecj A (ed.); The life-cycle of construction IT innovations. - Technology transfer from research to practice. [ Conference Proceedings / ISBN 91-7171-281-4] Stockholm (Sweden) 3-5 June 1998 http://itc.scix.net/cgi-bin/works/Show?w78-1998-25
43. 100%; open Karumo Jari, Majahalme Tapio (1994) Database approach to cost effective design of a frame system, Preproceedings, CIB W78 Workshop on Computer Integrated Construction, VTT, Espoo, Finland. http://itc.scix.net/cgi-bin/works/Show?w78-1994-15
44. 100%; open Koch C,König M,Neges M,Abramovici M (2013) Performance study on natural marker detection for augmented reality supported facility maintenance, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-19
45. 100%; open Koivu T J (2002) Future of Product Modeling and Knowledge sharing in the FM/AEC industry, Electronic Journal of Information technology in Construction, Vol. 7, pg. 139-156. http://itc.scix.net/cgi-bin/works/Show?itcon-2002-9
46. 100%; open Lavrencic,Darko (1970) THE INTRACRANIOVERTEBRAL VOLUMES, THE CEREBROSPINAL FLUID FLOW AND THE CEREBROSPINAL FLUID PRESSURE, THEIR HOMEOSTASIS AND ITS PHYSICAL REGULATION, published by author, 11 pages http://itc.scix.net/cgi-bin/works/Show?6284
47. 100%; open Leijten E, Vastert E, Maas G (1997) Knowledge aspects of construction planningredesign, Drogemuller R (editor); International council for building research studies and documentation. workshop (1997, Cairns) Information technology support for construction process reengineering Proceedings of CIB workshop - w78 “Working commission on information technology in construction” and tg10 “Task group on computer representation of design standards and building codes”, Cairns, Queensland, Australia, July 9th-11th, 1997; ISBN 086-443-636X http://itc.scix.net/cgi-bin/works/Show?w78-1997-241
48. 100%; open Leinonen J, Huovila P (2001) Requirements management tool as a catalyst for communication, Symposium Report on the 2nd Worldwide ECCE Symposium. Information and Communication Technology in the Practice of Building and Civil Engineering, RIL - Association of Finish Civil Engineers; VTT - Technical Research Centre of Finland, Building Technology, 6-8 June 2001, Espoo, Finland. http://itc.scix.net/cgi-bin/works/Show?ecce-2001-23
49. 100%; open Lockley S R, Sun M (1994) Data exchange system of combine, Preproceedings, CIB W78 Workshop on Computer Integrated Construction, VTT, Espoo, Finland. http://itc.scix.net/cgi-bin/works/Show?w78-1994-18
50. 100%; open Lownertz K, Tarandi V (1994) Cad components, Preproceedings, CIB W78 Workshop on Computer Integrated Construction, VTT, Espoo, Finland. http://itc.scix.net/cgi-bin/works/Show?w78-1994-19

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
show page 1 show page 2 show page 3 show page 4 this is page 5 show page 6 show page 7 show page 8 show page 9 show page 10 show page 11 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003