Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 13

# details full text citation check to select
1. 100%; open A Lähr & K-U Bletzinger (2005) Prediction of consequences for planning situation based decisions, http://itc.scix.net/cgi-bin/works/Show?w78-2005-a2-1-laehr-reg
2. 100%; open Akinci B, Staub S, Fischer M (1997) Productivity and cost analysis based on a 4d model, Drogemuller R (editor); International council for building research studies and documentation. workshop (1997, Cairns) Information technology support for construction process reengineering Proceedings of CIB workshop - w78 “Working commission on information technology in construction” and tg10 “Task group on computer representation of design standards and building codes”, Cairns, Queensland, Australia, July 9th-11th, 1997; ISBN 086-443-636X http://itc.scix.net/cgi-bin/works/Show?w78-1997-23
3. 100%; open C-W Liu, S-C Kang (2014) A Video-Enabled Dynamic Site Planner, Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 1562-1569 http://itc.scix.net/cgi-bin/works/Show?w78-2014-paper-194
4. 100%; open Can Ersen F?rat, Juhani Kiiras, Kalle Kähkönen, Pekka Huovinen (2007) Model based scheduling in building projects – is it oxymoron?, 337 http://itc.scix.net/cgi-bin/works/Show?w78_2007_21
5. 100%; open Can Ersen Firat, David Arditi, Juho-Pekka Hamalainen, Johan Stenstrand, Juhani Kiiras (2010) Quantity Take-Off in Model-Based Systems, CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-112
6. 100%; open Gustav Jansson, Helena Johnsson (2008) CONCURRENT ENGINEERING IN EDUCATIONAL PROJECTS: CASE STUDY SVARTO_BERGET, CIB W78 2008 - Improving the management of construction projects through IT adoption http://itc.scix.net/cgi-bin/works/Show?w78-2008-1-08
7. 100%; open Ha_kan Norberg & Thomas Olofsson (2008) A PROCESS MODEL FOR CONSTRUCTION SYNCHRONISATION USING TIME-SPACE PLANNING METHODS AND FIELD FORCE AUTOMATION, CIB W78 2008 - Improving the management of construction projects through IT adoption http://itc.scix.net/cgi-bin/works/Show?w78-2008-1-02
8. 100%; open Ito K, Kano Y (1997) 3-D graphical simulation for crane planning using object-orientedbuilding product model, Drogemuller R (editor); International council for building research studies and documentation. workshop (1997, Cairns) Information technology support for construction process reengineering Proceedings of CIB workshop - w78 “Working commission on information technology in construction” and tg10 “Task group on computer representation of design standards and building codes”, Cairns, Queensland, Australia, July 9th-11th, 1997; ISBN 086-443-636X http://itc.scix.net/cgi-bin/works/Show?w78-1997-171
9. 100%; open Mcgowan P H , Randall C W, Horner R M W (1993) Resource significant models for estimating, planning and control in construction, Mathur K S, Betts M P, Tham K W (editors); Management of information technology for construction; Singapore, August 1993 http://itc.scix.net/cgi-bin/works/Show?w78-1993-2-543
10. 100%; open Shanmuganayagam V (1993) Optimization of resource cost based on availability, Mathur K S, Betts M P, Tham K W (ed.); Pre-proceedings of the first international conference on the management of information technology for construction; Singapore, August 1993 http://itc.scix.net/cgi-bin/works/Show?w78-1993-35

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003