Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 21 to 30 of 54

# details full text citation check to select
21. 100%; open Jiwen Zhang, Tim Taylor, Roy Sturgill, Gabe Dadi and Nikiforos Stamatiadis (2017) Predictive Risk Modeling of Differential Bridge Settlement, Lean and Computing in Construction Congress (LC3): Volume I Š Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 145-152 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-060
22. 100%; open Jun Wang, Wenchi Shou, Peng Wu and Xiangyu Wang (2017) Linked Data for Cross-Domain Constraint Information Sharing in LNG Construction, Lean and Computing in Construction Congress (LC3): Volume I Š Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 811-818 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-318
23. 100%; open   Karkkainen T (1997) Using web in project management, production planning, material management and delivefung project documents , Sarja A (editor); Computers in the practice of building and civil engineering, Worldwide ECCE symposium; September 3-5, 1997, Finland http://itc.scix.net/cgi-bin/works/Show?ecce-1997-22
24. 100%; open Kassem M,Chavada R,Dawood N,Benghi C,Sanches R (2013) Road construction projects: an integrated and interactive visual tool for planning earthwork operations, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-58
25. 100%; open Kitchens, Kevin and Shiratuddin, Mohd Fairuz (2007) Interactive Home Design In A Virtual Environment, 7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 10-19. http://itc.scix.net/cgi-bin/works/Show?a893
26. 100%; open Leijten E, Vastert E, Maas G (1997) Knowledge aspects of construction planningredesign, Drogemuller R (editor); International council for building research studies and documentation. workshop (1997, Cairns) Information technology support for construction process reengineering Proceedings of CIB workshop - w78 “Working commission on information technology in construction” and tg10 “Task group on computer representation of design standards and building codes”, Cairns, Queensland, Australia, July 9th-11th, 1997; ISBN 086-443-636X http://itc.scix.net/cgi-bin/works/Show?w78-1997-241
27. 100%; open Lippold A (2013) Immersive conceptual design in a 3d city model, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-7
28. 100%; open M Betts & J Yang (2004) The Significance and Priorities of IT in Sustainable Construction Development, http://itc.scix.net/cgi-bin/works/Show?w78-2004-Paper-1
29. 100%; open Marasini R, Dawood N, Dean J (2001) Real-time management of stockyard using integrated digital technologies, Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2 http://itc.scix.net/cgi-bin/works/Show?w78-2001-44
30. 100%; open Mecca S, Marco M (2000) An IT oriented approach supporting the integration of technical risk, quality, environment and safety management in construction, Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000 http://itc.scix.net/cgi-bin/works/Show?w78-2000-621

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
show page 1 show page 2 this is page 3 show page 4 show page 5 show page 6 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003