Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 31 to 40 of 54

# details full text citation check to select
31. 100%; open   Mettem C J (1997) Changes in timber design codes - software opportunities, Sarja A (editor); Computers in the practice of building and civil engineering, Worldwide ECCE symposium; September 3-5, 1997, Finland http://itc.scix.net/cgi-bin/works/Show?ecce-1997-214
32. 100%; open Mohd Fairuz Shiratuddin, Walid Thabet (2007) Information-rich virtual environment (VE) for design review, 439 http://itc.scix.net/cgi-bin/works/Show?w78_2007_59
33. 100%; open Nashwan Dawood, Sushant Sikka (2007) Measuring the efectiveness of 4D planning as a valuable communication tool, 393 http://itc.scix.net/cgi-bin/works/Show?w78_2007_64
34. 100%; open Oguejiofor E, Kicinger R, Popovici E, Arciszewski T, De Jong K (2004) Intelligent tutoring systems: an ontology-based approach, International Journal of IT in Architecture, Engineering and Construction (IT-AEC), Volume 2, Issue 2, Rotterdam: Millpress Science Publishers http://itc.scix.net/cgi-bin/works/Show?itaec-2004-10
35. 100%; open Olle Samuelson (2007) The IT-barometer – a decade’s development of it use in the Swedish construction sector, 247 http://itc.scix.net/cgi-bin/works/Show?w78_2007_65
36. 100%; open Park M, Pena-Mora F (2003) Development of Dynamic Planning and Control Methodology (DPM): based on the user-defi ned dynamic modeling approach, International Journal of IT in Architecture, Engineering and Construction (IT-AEC), Volume 1, Issue 4, Rotterdam: Millpress Science Publishers http://itc.scix.net/cgi-bin/works/Show?itaec-2003-22
37. 100%; open Q Sun, S Wu (2011) A crowd movement and behaviour observe tool with configurable individual agents to support building layout design and event plan, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-58
38. 100%; open Raimar J.Scherer, Wael Sharmak (2008) Generic Process Template Description for the Effect of Risks on Project Schedule, CIB W78 2008 - Improving the management of construction projects through IT adoption http://itc.scix.net/cgi-bin/works/Show?w78-2008-5-02
39. 100%; open Rebolj D, Cus Babic N, Tibaut A, Magdic A (2002) Evolution of a road product model, Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark http://itc.scix.net/cgi-bin/works/Show?w78-2002-32
40. 100%; open Rischmoller L, Fischer M, Fox R, Alarcon L (2001) 4D planning and scheduling (4D-ps): grounding construction it research in industry practice, Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2 http://itc.scix.net/cgi-bin/works/Show?w78-2001-56

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
show page 1 show page 2 show page 3 this is page 4 show page 5 show page 6 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003