Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 28

# details full text citation check to select
1. 100%; open Arnold J A, Teicholz P (1995) Modeling and usle of component information in the process industry, Fischer M A, Law K H, Luiten B(ed.); Modelling of buildings through their life-cycle; Stanford, August 1995 http://itc.scix.net/cgi-bin/works/Show?w78-1995-348
2. 100%; open Arthur W T Leung, C M Tam (2010) Assessment of Impacts of Project Technical Complexity on Building Production Using Clustering and Knowledge-Based System, CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-14
3. 100%; open C Kasprzak, C Dubler, E Gannon, E Nulton (2011) ALIGNING BIM WITH FM: STREAMLINING THE PROCESS FOR FUTURE PROJECTS ON THE PENNSYLVANIA STATE UNIVERSITY CAMPUSES, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-74
4. 100%; open Edwards D J, Yang J, Love P E D (2004) A Computer Based Software Tool for Assessing Plant Operatives' Productivity, International Journal of IT in Architecture, Engineering and Construction (IT-AEC), Volume 2, Issue 4, Rotterdam: Millpress Science Publishers http://itc.scix.net/cgi-bin/works/Show?itaec-2004-23
5. 100%; open F Qin, F Fan, Z Li, H Qian, X Jin (2014) Thermal Simulation of Hydration Heat in Slab of Taishan Nuclear Power Plant Unit 2, Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 1214-1221 http://itc.scix.net/cgi-bin/works/Show?w78-2014-paper-151
6. 100%; open G Hamazaki, G B. Monteiro Lopes (2011) An Approach about the Modelling process to Geometric Objects with the ISO 15926 standard, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-149
7. 100%; open Howard H C (1995) Modeling process and form for process plant pipe routing, Fischer M A, Law K H, Luiten B(ed.); Modelling of buildings through their life-cycle; Stanford, August 1995 http://itc.scix.net/cgi-bin/works/Show?w78-1995-523
8. 100%; open I.C. Wu, A. Borrmann, E. Rank, U. Beißert & M. König (2009) A Pattern-Based Approach for Facilitating Schedule Generation and Cost Analysis in Bridge Construction Projects, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-18
9. 100%; open Mcgowan P H , Randall C W, Horner R M W (1993) Resource significant models for estimating, planning and control in construction, Mathur K S, Betts M P, Tham K W (editors); Management of information technology for construction; Singapore, August 1993 http://itc.scix.net/cgi-bin/works/Show?w78-1993-2-543
10. 100%; open N. Shaw, D. Bouchlaghem, D. Kerr (2007) Strategic review of the production of a 4D construction sequencing model – the lessons learnt, 213 http://itc.scix.net/cgi-bin/works/Show?w78_2007_62

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 show page 3 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003