Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 31 to 40 of 88

# details full text citation check to select
31. 100%; open Hatem Elbehairy, Tarek Hegazy, and Khaled Soudki (2006) Bridge Management System With Practical Work Zone Planning, Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June http://itc.scix.net/cgi-bin/works/Show?w78-2006-tf67
32. 100%; open Hauch P (2002) One-dimensional CAD-drawing - twentyfive years en route towards integrated modelling., Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark http://itc.scix.net/cgi-bin/works/Show?w78-2002-104
33. 100%; open Hauser M, Nollau C, Scherer R J (1996) Intelligent design tools as product model interfaces, Turk Z (ed.); Construction on the information highway. CIB proceedings, May, 1996 Univ. Of Ljubljana, Slovenia http://itc.scix.net/cgi-bin/works/Show?w78-1996-273
34. 100%; open Hegazy T, Moselhi O, Fazio P (1993) Managing construction knowledge in patterns: a neural network approach, Mathur K S, Betts M P, Tham K W (editors); Management of information technology for construction; Singapore, August 1993 http://itc.scix.net/cgi-bin/works/Show?w78-1993-2-331
35. 100%; open Hengwei Wang, Jiarui Lin and Jianping Zhang (2017) Operation-Level 4D Modeling and Visualization for Modular Building Based on Standard Activity Library, Lean and Computing in Construction Congress (LC3): Volume I Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 841-848 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-287
36. 100%; open Hong Ha Le, Hans-Joachim Bargstaedt (2010) A Simulation Approach to Integrate the Weather Impact into the Execution Planning, CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-22
37. 100%; open J Haymaker, C Kam & M Fischer (2005) A methodology to plan, communicate and control multidisciplinary design processes, http://itc.scix.net/cgi-bin/works/Show?w78-2005-p2-1-haymaker
38. 100%; open Johansson P, Popova M (2002) Case-based Design Using Weakly Structured Information, Electronic Journal of Information technology in Construction, Vol. 7, pg. 27-44. http://itc.scix.net/cgi-bin/works/Show?itcon-2002-2
39. 100%; open Jones K G (1996) The use of an evaluation matrix to inform the IT strategic planning process for maintenance management, Turk Z (ed.); Construction on the information highway. CIB proceedings, May, 1996 Univ. Of Ljubljana, Slovenia http://itc.scix.net/cgi-bin/works/Show?w78-1996-307
40. 100%; open Kahkonen K, Bjork B C, Arola P, Hult S (1992) Building regulations as a part of a digitalized building information service, Vanier D, Russell T (ed.); Computers and information in construction; Montreal, May, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1992-271

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
show page 1 show page 2 show page 3 this is page 4 show page 5 show page 6 show page 7 show page 8 show page 9 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003