Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 196

# details full text citation check to select
1. 100%; open (1992) Computer aided conformance checking, Vanier D, Russell T (ed.); Computers and information in construction; Montreal, May, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1992-177
2. 100%; open A Akcamete (2011) An Approach to Capture Facility Maintenance and Repair Information to Store Change History, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-94
3. 100%; open A Asadi, A Hadavi, R J. Krizek (2011) Bridge Life-Cycle Cost Analysis Using Artificial Neural Networks, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-37
4. 100%; open A Grilo, R Jardim-Gonçalves & A Steiger-Garcao (2005) Shifting the construction interoperability paradigm, in the advent of Service Oriented and Model Driven Architectures, http://itc.scix.net/cgi-bin/works/Show?w78-2005-d5-3-grilo
5. 100%; open A Kiviniemi & J Haymaker (2005) Integration of Multiple Product Models, http://itc.scix.net/cgi-bin/works/Show?w78-2005-kn-w2-0-kiviniemi
6. 100%; open A Kiviniemi, M Fischer & V Bazjanac (2005) Integration of Multiple Product Models: IFC Model Servers as a Potential Solution, http://itc.scix.net/cgi-bin/works/Show?w78-2005-kn-w2-1-kiviniemi
7. 100%; open A Lähr & K-U Bletzinger (2005) Prediction of consequences for planning situation based decisions, http://itc.scix.net/cgi-bin/works/Show?w78-2005-a2-1-laehr-reg
8. 100%; open A Magdic & D Rebolj (2005) Human oriented mobile system for on-site problem solving, http://itc.scix.net/cgi-bin/works/Show?w78-2005-a4-3-magdic
9. 100%; open A. Al-Bazi, N. Dawood & Z. Khan (2009) Development of Hybrid Simulation and Genetic Algorithms System for Solving Complex Crew Allocation Problems, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-43
10. 100%; open A. Borrmann, Y. Ji, I.-C. Wu, M. Obergrießer, E. Rank, C. Klaubert & W. Günthner (2009) ForBAU – The virtual construction site project, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-21

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 show page 3 show page 4 show page 5 show page 6 ... show page 20 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003