Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 8 of 8

# details full text citation check to select
1. 100%; open A Guerriero, S Kubicki, L Schwartz (2011) Design and assessment of prospective mobile services for construction, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-111
2. 100%; open Chege L W (2001) E-commerce and value chain management – the prospects and challenges for the South African construction industry, Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2 http://itc.scix.net/cgi-bin/works/Show?w78-2001-62
3. 100%; open Eastman C M (1988) Conceptual modeling in architectural design, Christiansson P, Karlsson H (ed.); Conceptual modelling of buildings. CIB W74+W78 seminar, October, 1988. Lund university and the Swedish building centre. CIB proceedings 126 http://itc.scix.net/cgi-bin/works/Show?w78-1988-79
4. 100%; open Janne Porkka, Kalle Kähkönen (2007) Software development approaches and challenges of 4D product models, 85 http://itc.scix.net/cgi-bin/works/Show?w78_2007_41
5. 100%; open Markus Bauer, Jaime Acevedo-Alvarez (2006) ICONDA: History And Prospects Of An International Information System (Publishing, Retrieval And Dissemination), Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June http://itc.scix.net/cgi-bin/works/Show?w78-2006-tf618
6. 100%; open Rubinstein, M. and Salagnac, J-L. (1986) Interest and Prospects of Robotics in Construction, Proceedings of the 10th Triennial Congress of the International Council for Building Research, Studies and Documentation: CIB 86: advancing building technology: CIB W78, Washington, USA, 22-26 September, pg. 1092-1097 http://itc.scix.net/cgi-bin/works/Show?w78-1986-129
7. 100%; open Semenov V,Anichkin A,Morozov S,Tarlapan O,Zolotov V (2013) Effective project scheduling under workspace congestion and workflow disturbance factors, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-25
8. 100%; open Toma˛ Pazlar, ˇiga Turk (2007) Evaluation of IFC optimization, 61 http://itc.scix.net/cgi-bin/works/Show?w78_2007_91

No more hits.

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003