Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 67

# details full text citation check to select
1. 100%; open   A Almohsen, Janaka Ruwanpura (2011) Logistics Management in Construction Industry, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-51
2. 100%; open Aalami F, Fischer M (1998) Joint product and process model elaboration based on construction method models, Bjork B C, Jagbecj A (ed.); The life-cycle of construction IT innovations. - Technology transfer from research to practice. [ Conference Proceedings / ISBN 91-7171-281-4] Stockholm (Sweden) 3-5 June 1998 http://itc.scix.net/cgi-bin/works/Show?w78-1998-2
3. 100%; open Aleš Mrkela & Danijel Rebolj (2009) Automated construction schedule creation using project information model, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-03
4. 100%; open Atul Khanzode, Martin Fischer, Dean Reed (2007) Challenges and benefits of implementing virtual design and construction technologies for coordination of mechanical, electrical, and plumbing systems on a large healthcare project, 205 http://itc.scix.net/cgi-bin/works/Show?w78_2007_20
5. 100%; open Bügler M,Dori G,Borrmann A (2013) Swap based process schedule optimization using discrete-event simulation, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-24
6. 100%; open C.E. Firat, D. Arditi, J.P. Hämäläinen & J. Kiiras (2009) Extended model-based master scheduling for building projects using advanced line of balance, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-29
7. 100%; open Can Ersen Firat, David Arditi, Juho-Pekka Hamalainen, Johan Stenstrand, Juhani Kiiras (2010) Quantity Take-Off in Model-Based Systems, CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-112
8. 100%; open Chang Hak, Kim; Leen Seok, Kang; Sang Bok, Jee (2006) 4D System for Visualizing Schedule Progress of Horizontal Construction Project Including Earthwork, http://itc.scix.net/cgi-bin/works/Show?85cf
9. 100%; open Christensen L C, Christiansen T R, Jin Y, Kunz J, Levitt R E (1995) Extending enterprise modeling beyond engineering - a life cycle model of hydraulic systems, Fischer M A, Law K H, Luiten B(ed.); Modelling of buildings through their life-cycle; Stanford, August 1995 http://itc.scix.net/cgi-bin/works/Show?w78-1995-543
10. 100%; open D. Zuppa & Raja R.A. Issa (2008) ALIGNING INTERESTS KEY TO DEVELOPING TRUST IN DEPLOYING COLLABORATIVE TECHNOLOGIES IN CONSTRUCTION, CIB W78 2008 - Improving the management of construction projects through IT adoption http://itc.scix.net/cgi-bin/works/Show?w78-2008-1-03

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 show page 3 show page 4 show page 5 show page 6 show page 7 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003