Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 31 to 40 of 55

# details full text citation check to select
31. 100%; open L Rischmoller & E Valle (2005) Using 4D in a new ""2D + time"" Conceptualization"", http://itc.scix.net/cgi-bin/works/Show?w78-2005-d3-4-rischmoller
32. 100%; open Li H-X,Liu H,Zhou X,Sun C,Ngan K-H,Al-Hussein M (2013) Cash flow optimization and visualization of residence housing for builders, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-13
33. 100%; open Mallasi Z, Dawood N N (2002) Registering space requirements of construction operations using site-PECASO model, Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark http://itc.scix.net/cgi-bin/works/Show?w78-2002-95
34. 100%; open Mallasi Z, Dawood N (2003) A generic inclusion of space strategies with activity execution patterns in 4D tools, Amor R (editor) Proceedings of the CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284, ISBN 0-908689-71-3, Waiheke Island, New Zealand, 23-25 April 2003, pg. 213-223. http://itc.scix.net/cgi-bin/works/Show?w78-2003-213
35. 100%; open Marasini R, Dawood N (2000) Simulation approach to optimise stockyard layout: a case study in precast concrete products industry, Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000 http://itc.scix.net/cgi-bin/works/Show?w78-2000-610
36. 100%; open Maryam Montazer, Danijel Rebolj and Detlef Heck (2017) A Comparison Review of Automated Construction Scheduling Methods, Lean and Computing in Construction Congress (LC3): Volume I Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 137-144 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-010
37. 100%; open Nashwan Dawood, Sushant Sikka (2007) Measuring the efectiveness of 4D planning as a valuable communication tool, 393 http://itc.scix.net/cgi-bin/works/Show?w78_2007_64
38. 100%; open Nassar K M, Beliveau Y (1999) Integration of parametric geometric modeling and construction simulation, Lacasse M A, Vanier D J (ed.); Information technology in construction, volume 4, ISBN 0-660-17743-9; Vancouver, May 30 - June 3, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1999-2601
39. 100%; open Raj Kapur Shah, Nashwan Dawood (2007) Development of innovative visualisation model in road construction, 499 http://itc.scix.net/cgi-bin/works/Show?w78_2007_74
40. 100%; open Semenov V,Anichkin A,Morozov S,Tarlapan O,Zolotov V (2013) Effective project scheduling under workspace congestion and workflow disturbance factors, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-25

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
show page 1 show page 2 show page 3 this is page 4 show page 5 show page 6 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003