Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 41 to 50 of 55

# details full text citation check to select
41. 100%; open Shah R,Dawood N,Castro S (2013) Automatic generation and visualization of location-based scheduling, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-57
42. 100%; open Siu M-F,Lu M,AbouRizk S (2013) Improving sophistication and representation of skilled labor schedules on plant shutdown and maintenance projects, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-17
43. 100%; open SM Holzer & F Geyer (2005) Resources, Time & Money: Why project schedules simply don't work, http://itc.scix.net/cgi-bin/works/Show?w78-2005-kn-w1-3-holzer
44. 100%; open Song Y, Chua D K H (2003) COSSE: component state network centric model for verifying temporal and spatial consistency in project schedules, Amor R (editor) Proceedings of the CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284, ISBN 0-908689-71-3, Waiheke Island, New Zealand, 23-25 April 2003, pg. 325-333. http://itc.scix.net/cgi-bin/works/Show?w78-2003-325
45. 100%; open Sunaga N, Nakamura H, Okazawa T (2000) Project management system for small-medium building construction project, Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000 http://itc.scix.net/cgi-bin/works/Show?w78-2000-917
46. 100%; open T Cerovšek (2011) A Framework for CPD and 5D BIM process REUSE, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-157
47. 100%; open Thabet W Y, Wakefield R R, Waly A F (1999) Virtual construction for automated schedule generation, Lacasse M A, Vanier D J (ed.); Information technology in construction, volume 4, ISBN 0-660-17743-9; Vancouver, May 30 - June 3, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1999-2939
48. 100%; open U. Beißert, M. König & H.-J. Bargstädt (2009) Considering Quality Aspects for Construction Scheduling using Constraint-Based Simulation, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-11
49. 100%; open Ulrike Beißert, Markus König, Hans-Joachim Bargstädt (2007) Constraint-based simulation of outfitting processes in building engineering, 491 http://itc.scix.net/cgi-bin/works/Show?w78_2007_95
50. 100%; open V Benjaoran & N Dawood (2005) An application of Artificial Intelligence Planner for bespoke precast concrete production planning: a case study, http://itc.scix.net/cgi-bin/works/Show?w78-2005-a11-5-benjaoran

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
show page 1 show page 2 show page 3 show page 4 this is page 5 show page 6 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003