Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 20

# details full text citation check to select
1. 100%; open Carter G, Smith S (2001) IT tool for construction site safety management, Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2 http://itc.scix.net/cgi-bin/works/Show?w78-2001-55
2. 100%; open Choudhury I, Rajan S S (2003) Time-cost relationship for residential construction in Texas, Amor R (editor) Proceedings of the CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284, ISBN 0-908689-71-3, Waiheke Island, New Zealand, 23-25 April 2003, pg. 73-80. http://itc.scix.net/cgi-bin/works/Show?w78-2003-73
3. 100%; open Clarke P, Heathcote K (2001) A longitudinal study into perceptions of the effect of I.T. on training, human relations and productivity as function of position, age, experience and gender, Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2 http://itc.scix.net/cgi-bin/works/Show?w78-2001-49
4. 100%; open Clarke P (2000) Effectiveness of I.T. in computerised maintenance management: a longitudinal study of the analysis of phenomenological perceptions., Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000 http://itc.scix.net/cgi-bin/works/Show?w78-2000-219
5. 100%; open   D Ilter (2011) A SYSTEM OF SYSTEMS (SOS) APPROACH TO DISPUTE, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-133
6. 100%; open E Ergen, A Dikbas,I Tekce, D Ilter, H Giritli, M Jablonski, A Kowalska (2011) Investigation of price banks and life cycle inventoriesfor pan-European life cycle costanalysis system, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-97
7. 100%; open Finch E (1995) The significance of markup languages in construction, Fischer M A, Law K H, Luiten B(ed.); Modelling of buildings through their life-cycle; Stanford, August 1995 http://itc.scix.net/cgi-bin/works/Show?w78-1995-127
8. 100%; open Kelly G,Serginson M,Lockley S,Dawood N,Kassem M (2013) BIM for facility management: a review and a case study investigating the value and challenges, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-20
9. 100%; open Kumaraswamy M M (2003) Identifying needs and potential for decision support in construction procurement, International Journal of IT in Architecture, Engineering and Construction (IT-AEC), Volume 1, Issue 2, Rotterdam: Millpress Science Publishers http://itc.scix.net/cgi-bin/works/Show?itaec-2003-10
10. 100%; open   L Pietrosemoli, C Rodríguez Monroy (2011) Construction competitiveness and knowledge management. Basic considerations, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-2

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003