Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 27

# details full text citation check to select
1. 100%; open _. Jarský (2009) Modelling of buildings and projects with utility assessment, CIB W078 2009 http://itc.scix.net/cgi-bin/works/Show?w78-2009-1-39
2. 100%; open Alonso J M, Alvarruiz F, Hernandez V, Vidal A M (1998) HPC in the building construction sector, Bjork B C, Jagbecj A (ed.); The life-cycle of construction IT innovations. - Technology transfer from research to practice. [ Conference Proceedings / ISBN 91-7171-281-4] Stockholm (Sweden) 3-5 June 1998 http://itc.scix.net/cgi-bin/works/Show?w78-1998-5
3. 100%; open Anshuman S, Kumar B (2004) Architecture and HCI: a review of trends towards an integrative approach to designing responsive space, International Journal of IT in Architecture, Engineering and Construction (IT-AEC), Volume 2, Issue 4, Rotterdam: Millpress Science Publishers http://itc.scix.net/cgi-bin/works/Show?itaec-2004-21
4. 100%; open Chao L C (1999) Simulation of construction operation with direct inputs of physical factors, Lacasse M A, Vanier D J (ed.); Information technology in construction, volume 4, ISBN 0-660-17743-9; Vancouver, May 30 - June 3, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1999-2287
5. 100%; open D Lee, J Shin, G-C Cha, S Park (2013) Real-times Control of HVAC Using BEMS at Energy Operating Center, Proceedings of the 30th International Conference of CIB W78, Beijing, China, 19-12 October, 353-360 http://itc.scix.net/cgi-bin/works/Show?w78-2013-paper-70
6. 100%; open Gerald Faschingbauer, Raimar J. Scherer (2007) Model and sensor data management for geotechnical engineering application, 711 http://itc.scix.net/cgi-bin/works/Show?w78_2007_32
7. 100%; open Gurevich U,Sacks R (2013) Integrated virtual reality and discrete event simulation methods for production system research in construction, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-52
8. 100%; open Issa, Mohamed; Rankin, Jeff; Christian, John; and Pemberton, Evan (2007) Using Interactive Workspaces for Team Design Project Meetings, 7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 110-121. http://itc.scix.net/cgi-bin/works/Show?a72e
9. 100%; open Jiwen Zhang, Tim Taylor, Roy Sturgill, Gabe Dadi and Nikiforos Stamatiadis (2017) Predictive Risk Modeling of Differential Bridge Settlement, Lean and Computing in Construction Congress (LC3): Volume I – Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 145-152 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-060
10. 100%; open Karhu, Vesa (2001) A generic construction process modelling method, Royal Institute of Technology, Department of Construction Management and Economics, Ph.D. Thesis, Stockholm, Sweden, 2001 http://itc.scix.net/cgi-bin/works/Show?ba5c

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 show page 3 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003