Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 632

# details full text citation check to select
1. 100%; open , Jagbeck A, Karstila K (1998) Concurrent engineering in the tendering process of building and construction, Bjork B C, Jagbecj A (ed.); The life-cycle of construction IT innovations. - Technology transfer from research to practice. [ Conference Proceedings / ISBN 91-7171-281-4] Stockholm (Sweden) 3-5 June 1998 http://itc.scix.net/cgi-bin/works/Show?w78-1998-43
2. 100%; open A A Aibinu, P de Jong, H Wamelink, A Koutamanis (2014) Using Effort Distribution Analysis to Evaluate the Performance of Building Information Modeling Process, Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 73-80 http://itc.scix.net/cgi-bin/works/Show?w78-2014-paper-010
3. 100%; open A Akcamete (2011) An Approach to Capture Facility Maintenance and Repair Information to Store Change History, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-94
4. 100%; open   A Almohsen, Janaka Ruwanpura (2011) Logistics Management in Construction Industry, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-51
5. 100%; open A Asadi, A Hadavi, R J. Krizek (2011) Bridge Life-Cycle Cost Analysis Using Artificial Neural Networks, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-37
6. 100%; open A Cemesova, Y Rezgui, C J. Hopfe (2011) Possibilities and challenges created by a smart material in building performance simulation, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-139
7. 100%; open A den Otter, H Jan Pels, I Iliescu (2011) BIM VERSUS PLM: RISKS AND BENEFITS, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-120
8. 100%; open A Francis, E Miresco (2014) Case Studies for the Planning and Monitoring of Unit- and Fixed-Price Contracts Using Project Scheduling Software, Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 1021-1028 http://itc.scix.net/cgi-bin/works/Show?w78-2014-paper-127
9. 100%; open A Galach & Z Kotulski (2005) Risk assessment in disaster recovery strategies development, http://itc.scix.net/cgi-bin/works/Show?w78-2005-a3-3-galach
10. 100%; open A Ganah, G A John (2016) Understanding BIM in the UK Construction Industry using an Activity Theory (AT) Approach, Proceedings of the 33rd International Conference of CIB W78, Brisbane, Australia, 31 October - 2 November http://itc.scix.net/cgi-bin/works/Show?w78-2016-paper-005

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 show page 3 show page 4 show page 5 show page 6 ... show page 64 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003