Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 10 of 32

# details full text citation check to select
1. 100%; open A Grilo, R Jardim-Gonçalves & A Steiger-Garcao (2005) Shifting the construction interoperability paradigm, in the advent of Service Oriented and Model Driven Architectures, http://itc.scix.net/cgi-bin/works/Show?w78-2005-d5-3-grilo
2. 100%; open A Mediavilla, A Romero, J Pérez,F J Mata (2011) Energy efficiency assessment in urban environments using GIS, Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October http://itc.scix.net/cgi-bin/works/Show?w78-2011-Paper-144
3. 100%; open Abduh M, Skibniewski M J (1999) Utility assessment of electronic networking technologies in construction, Lacasse M A, Vanier D J (ed.); Information technology in construction, volume 4, ISBN 0-660-17743-9; Vancouver, May 30 - June 3, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1999-2259
4. 100%; open Alarcon L F, Bastias A (1998) Computer aided strategic planning, Bjork B C, Jagbecj A (ed.); The life-cycle of construction IT innovations. - Technology transfer from research to practice. [ Conference Proceedings / ISBN 91-7171-281-4] Stockholm (Sweden) 3-5 June 1998 http://itc.scix.net/cgi-bin/works/Show?w78-1998-3
5. 100%; open Alina Delgado, Frank DeTroyer (2010) Process Model for Understanding Stakeholders Expectations in New Projects Development, CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-34
6. 100%; open Anfas Thowfeek, Nashwan Dawood, Ramesh Marasini, John Dean (2007) Industrial case study of innovative managerial control system applied to site control process (IMCS-CON), 309 http://itc.scix.net/cgi-bin/works/Show?w78_2007_16
7. 100%; open Arthur W T Leung, C M Tam (2010) Assessment of Impacts of Project Technical Complexity on Building Production Using Clustering and Knowledge-Based System, CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-14
8. 100%; open B Giel, R R A Issa, R Liu (2012) Perceptions of Organizational BIM Maturity Variables in The US AECO Industry, Proceedings of the 29th International Conference of CIB W78, Beirut, Lebanon, 17-19 October, 394-403 http://itc.scix.net/cgi-bin/works/Show?w78-2012-Paper-69
9. 100%; open Brandon P, Watson I (1992) An expert system for strategic maintenance planning, Vanier D, Russell T (ed.); Computers and information in construction; Montreal, May, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1992-103
10. 100%; open Chen S E, Ostwald M J (1993) Design decision support from informed project time-cost performance simulation, Mathur K S, Betts M P, Tham K W (editors); Management of information technology for construction; Singapore, August 1993 http://itc.scix.net/cgi-bin/works/Show?w78-1993-2-529

For more results click below:

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
this is page 1 show page 2 show page 3 show page 4 Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003