Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Search Results

Facilitated by the SciX project

Hits 1 to 9 of 9

# details full text citation check to select
1. 100%; open A Behnam, T Harfield, R Kenley (2016) Linear vs. Systems Approach to Production Scheduling in Construction, Proceedings of the 33rd International Conference of CIB W78, Brisbane, Australia, 31 October - 2 November http://itc.scix.net/cgi-bin/works/Show?w78-2016-paper-027
2. 100%; open Arnaud Doniec, Stéphane Espié, René Mandiau, Sylvain Piechowiak (2006) Traffic Simulation At Junction : Non-Normative Practices Vs. Deadlock, Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June http://itc.scix.net/cgi-bin/works/Show?w78-2006-tf400
3. 100%; open K Davies, D McMeel, S Wilkinson (2014) Practice vs. Prescription - An Examination of the Defined Roles in the NZ BIM Handbook, Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 33-40 http://itc.scix.net/cgi-bin/works/Show?w78-2014-paper-005
4. 100%; open Kumaraswamy M M (2003) Identifying needs and potential for decision support in construction procurement, International Journal of IT in Architecture, Engineering and Construction (IT-AEC), Volume 1, Issue 2, Rotterdam: Millpress Science Publishers http://itc.scix.net/cgi-bin/works/Show?itaec-2003-10
5. 100%; open Laptali E, Bouchlaghem N, Wild S, (1997) A computer model for time and cost optimisation during pretenderstage, Drogemuller R (editor); International council for building research studies and documentation. workshop (1997, Cairns) Information technology support for construction process reengineering Proceedings of CIB workshop - w78 “Working commission on information technology in construction” and tg10 “Task group on computer representation of design standards and building codes”, Cairns, Queensland, Australia, July 9th-11th, 1997; ISBN 086-443-636X http://itc.scix.net/cgi-bin/works/Show?w78-1997-225
6. 100%; open M Gheisari, G Williams, B N Walker, J Irizarry (2014) Locating Building Components in a Facility Using Augmented Reality vs. Paper-Based Methods: A User-Centered Experimental Comparison, Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 850-857 http://itc.scix.net/cgi-bin/works/Show?w78-2014-paper-106
7. 100%; open Osvaldo M. Borges and António P. Antunes (2006) School Network Planning In Cape Vert: Maximizing Accessibility Vs Minimizing Investment, Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June http://itc.scix.net/cgi-bin/works/Show?w78-2006-tf149
8. 100%; open Tsou J Y, Turner J A, Borkin H J (1992) RDBM vs OODBM in support of integrated data bases for computer aided building design, Vanier D, Russell T (ed.); Computers and information in construction; Montreal, May, Canada http://itc.scix.net/cgi-bin/works/Show?w78-1992-447
9. 100%; open Yifan Gao, Vicente A. Gonz‡lez and Tak Wing Yiu (2017) Serious Games vs. Traditional Tools in Construction Safety Training: A Review, Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 653-660 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-070

No more hits.

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003