Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Paper lc3-2017-192:
Construction Delay and Disruption Claims Assisted Through BIM Technology

Facilitated by the SciX project

Ageliki Valavanoglou, Danijel Rebolj and Detlef Heck

Construction Delay and Disruption Claims Assisted Through BIM Technology

Abstract: Construction projects are frequently subjected to delay and disruption leading to dispute between project participants regarding the entitlement to compensation. Challenges associated with the analysis of delay and disruption and the subsequent preparation of the claim conducted by a forensic analysis expert include the difficult retrieval of scattered, unstructured information and lack of adequate documentation, leading to weak analysis and therefore insufficient proof of causation and entitlement.This paper illustrates the chronological information generation regarding delay and disruption in the construction phase proposing a framework based on Building Information Modelling and structured information integration, to facilitate easy filing and retrieval of relevant documentation for claim preparation.

Keywords: Delay and Disruption Claims, Documentation, Forensic Analysis, Building Information Modelling, BIM Collaboration Format

DOI: https://doi.org/10.24928/JC3-2017/0192

Full text: content.pdf (2,026,714 bytes) (available to registered users only)

Series: jc3:2017 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
FIRST PREVIOUS NEXT LAST Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003