Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Paper w78-1996-319:
Building construction primary task models

Facilitated by the SciX project

Kangari R, Sadri S

Building construction primary task models

Abstract: This paper provides a foundation for developing an integrated conceptual data model for managing information during the life cycle of a building. The Soft System Methodology (SSM) was used to develop Issue Based (IB) and Building Construction Primary Task (BCPT) models. The IB model was found to be an effective system for presenting a conceptual organization and the interrelationships among the different subsystems of the organization. The BCPT model provides a practical framework for building construction process analysis. It defines the minimum and necessary tasks required to support the subsystems of the IB model. These two models have formed a foundation for development of a conceptual data model for information integration utilizing the IDEF1x technique.

Keywords:

DOI:

Full text: content.pdf (55,117 bytes) (available to registered users only)

Series: w78:1996 (browse)
Cluster: papers of the same cluster (result of machine made clusters)
Class: class.processing (0.013561) class.retrieve (0.001557)
Similar papers:
Sound: read aloud.

Permission to reproduce these papers has been graciously provided by the University of Ljubljana. The assistance of the editor, Prof. Ziga Turk, is gratefully appreciated.

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003