Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Paper w78-2009-1-08:
BPM-driven Construction Client Requirements Change Management

Facilitated by the SciX project

A.K. Jallow, P. Demian, A.N. Baldwin & C.J. Anumba

BPM-driven Construction Client Requirements Change Management

Abstract: Changing client requirements is one of the principal factors that contribute to delays and budget overruns of construction projects which as a result causes claims, disputes and client dissatisfaction. Change management ensures that such changes are handled through a properly coordinated and controlled process and retained throughout the project life cycle. This paper presents an empirical study that investigated the potential for an automated process of managing changes to clients’ requirements in construction projects. An initial focus group meeting was set up as a preliminary study which was followed by two case studies. Participant observation was used to conduct the case studies during which technical documents were also reviewed. The results show that current requirements change management process lacks efficiency. The paper concludes that business process management (BPM) approach could be a solution to better manage the requirements change process

Keywords:

DOI:

Full text: content.pdf (85,203 bytes) (available to registered users only)

Series: w78:2009 (browse)
Cluster:
Class:
Similar papers:
Sound: N/A.

 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003