Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Records in basket with w78-1994-2

Facilitated by the SciX project

# details full text citation check to select
1. 100%; open Tarandi V (1993) Object oriented communication with NICC (neutral intelligent CAD communication), Mathur K S, Betts M P, Tham K W (editors); Management of information technology for construction; Singapore, August 1993 http://itc.scix.net/cgi-bin/works/Show?w78-1993-2-517
2. 100%; open Kirihara, T. (1990) State of the Art of CAD Utilization in Japan, Proceedings of CIB W78+74, CIB Publication 138, Tatsuo Terai (editor), Tokyo, Japan, 17-19 September, pg. 125-128 http://itc.scix.net/cgi-bin/works/Show?w78-1990-a42
3. 100%; open Badrah M K, MacLeod I A, Kumar B (2000) Development tools for computer-aided design applications in structural engineering, Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000 http://itc.scix.net/cgi-bin/works/Show?w78-2000-79
4. 100%; open Aish R (1988) Master architect: an object based architectural design and production system, Christiansson P, Karlsson H (ed.); Conceptual modelling of buildings. CIB W74+W78 seminar, October, 1988. Lund university and the Swedish building centre. CIB proceedings 126 http://itc.scix.net/cgi-bin/works/Show?w78-1988-235
5. 100%; open Chandansingh R A, Vos CH J (1993) Modelling the effects of information technology on construction, Mathur K S, Betts M P, Tham K W (editors); Management of information technology for construction; Singapore, August 1993 http://itc.scix.net/cgi-bin/works/Show?w78-1993-2-559
6. 100%; open FI Stahl (1984) Initial Graphics Exchange Specification: Architecture-Engineering-Construction Applications and Extensions, Proceedings of the 1st International Colloquium of CIB W78, CIB Publication 78, Watford, UK, 5-7 June, pg. 26-29 http://itc.scix.net/cgi-bin/works/Show?w78-1984-d1-7-stahl
7. 100%; open Wang Shou Qing (2001) ESSCAD: Expert system integrating construction scheduling with CAD, Coetzee G, Boshoff F (ed.); IT in construction in Africa 2001; Mpumalunga, 30 May - 1 June, South Africa; ISBN 0-7988-5531-2 http://itc.scix.net/cgi-bin/works/Show?w78-2001-46
8. 100%; open Augenbroe G L M (1993) Enterprise integration of future building design systems, Mathur K S, Betts M P, Tham K W (editors); Management of information technology for construction; Singapore, August 1993 http://itc.scix.net/cgi-bin/works/Show?w78-1993-2-223
9. 100%; open Junge R (1995) Aspects of new CAAD environments, Fischer M A, Law K H, Luiten B(ed.); Modelling of buildings through their life-cycle; Stanford, August 1995 http://itc.scix.net/cgi-bin/works/Show?w78-1995-565


 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
share this selectionHome page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003