Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Records viewed by users who viewed 30d9

Facilitated by the SciX project

Examining 128770 /Show pages, record 30d9 was shown 29 times since 2018/04/23 00:35 by 23 users. These users also showed (more popular first):

# details full text citation check to select
1. 100%; open J Mukkavaara, G Jansson, A Holmberg, M Sandberg (2016) Approach for Automated Planning Using 5D-BIM, Proceedings of the 33rd International Conference of CIB W78, Brisbane, Australia, 31 October - 2 November http://itc.scix.net/cgi-bin/works/Show?w78-2016-paper-025
2. 100%; open Ivan Mutis, Raja R.A. Issa, Ian Flood (2007) Missing fundamental stratum of the current forms of the representation of concepts in construction, 615 http://itc.scix.net/cgi-bin/works/Show?w78_2007_37
3. 100%; open Dawood, Nash and Sikka, Sushant (2007) Measuring the Effectiveness of 4D Planning as a Valuable Communication Tool, 7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 198-205. http://itc.scix.net/cgi-bin/works/Show?bd6c
4. 100%; open Faisal Manzoor Arain (2007) IT-based approach for effective management of project changes: a change management system (CMS), 353 http://itc.scix.net/cgi-bin/works/Show?w78_2007_29
5. 100%; open Shin, Do Hyoung; Jung, Wonjo; and Dunston, Phillip (2007) Large Scale Calibration for Augmented Reality on Construction Sites, 7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 139-146. http://itc.scix.net/cgi-bin/works/Show?30d9
6. 100%; open Bjork, Bo-Christer (1995) Requirements and information structures for building product data models, Technical Research Centre of Finland, VTT Publications 245, December 1995 Ph.D. Thesis http://itc.scix.net/cgi-bin/works/Show?0fb9
7. 100%; open Issa, Mohamed; Rankin, Jeff; Christian, John; and Pemberton, Evan (2007) Using Interactive Workspaces for Team Design Project Meetings, 7th International Conference on Construction Applications of Virtual Reality (CONVR 2007), Oct. 22-23, University Park, PA, 110-121. http://itc.scix.net/cgi-bin/works/Show?a72e
8. 100%; open Nashwan Dawood, Sushant Sikka (2007) Measuring the efectiveness of 4D planning as a valuable communication tool, 393 http://itc.scix.net/cgi-bin/works/Show?w78_2007_64
9. 100%; open Ipek Gursel, Rudi Stouffs, Sevil Sariyildiz (2007) A computational framework for integration of performance information during the building lifecycle, 379 http://itc.scix.net/cgi-bin/works/Show?w78_2007_36


 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003