Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Records viewed by users who viewed convr-2013-2

Facilitated by the SciX project

Examining 186404 /Show pages, record convr-2013-2 was shown 325 times since 2019/07/22 04:37 by 79 users. These users also showed (more popular first):

# details full text citation check to select
1. 100%; open Han K,Gwak J-Y,Golparvar-Fard M,Saidi K,Cheok G,Franaszek M,Lipman R (2013) Vision-based field inspection of concrete reinforcing bars, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-28
2. 100%; open Kelly G,Serginson M,Lockley S,Dawood N,Kassem M (2013) BIM for facility management: a review and a case study investigating the value and challenges, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-20
3. 100%; open Bügler M,Dori G,Borrmann A (2013) Swap based process schedule optimization using discrete-event simulation, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-24
4. 100%; open Côté S,Trudel P,Desbiens M-A,Giguère M,Snyder R (2013) Live mobile panoramic high accuracy augmented reality for engineering and construction, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-27
5. 100%; open   Costin A,Shaak A,Teizer J,Pfeffer G,Khanzode A,Saripally D,Chao O,Schoner B,Shah S (2013) Passive RFID-based asset tracking and project management on a large hospital project, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-22
6. 100%; open Flood I,Nowrouzian V (2013) Construction process modelling: a constrained graphics approach versus conventional construction simulation, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-26
7. 100%; open Semenov V,Anichkin A,Morozov S,Tarlapan O,Zolotov V (2013) Effective project scheduling under workspace congestion and workflow disturbance factors, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-25
8. 100%; open Mao S,Shen X,Lu M,Wu X (2013) Real-time tablet-based virtual reality implementation to facilitate tunnel boring machine steering control in tunnel construction, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-23
9. 100%; open Castronovo F,Nikolic D,Liu Y,Messner J (2013) An evaluation of immersive virtual reality systems for design reviews, CONVR 2013 http://itc.scix.net/cgi-bin/works/Show?convr-2013-2


 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003