Welcome
Digital library of construction informatics
and information technology in civil engineering and construction
 

Works 

Records viewed by users who viewed lc3-2017-079

Facilitated by the SciX project

Examining 118797 /Show pages, record lc3-2017-079 was shown 105 times since 2019/07/15 23:23 by 66 users. These users also showed (more popular first):

# details full text citation check to select
1. 100%; open Alan Hore, Barry McAuley and Roger West (2017) BIM Innovation Capability Programme of Ireland, Lean and Computing in Construction Congress (LC3): Volume I Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 759-766 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-079
2. 100%; open E. William East, Danielle Love, Nicholas Nisbet (2010) A Life-Cycle Model for Contracted Information Exchange, CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-23
3. 100%; open Hong Ha Le, Hans-Joachim Bargstaedt (2010) A Simulation Approach to Integrate the Weather Impact into the Execution Planning, CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-22
4. 100%; open Yongcheol Lee, Eunhwa Yang, Charles Eastman and Kathy Roper (2017) Modularized Validation of a Building Information Model According to the Specifications of the Facility Management Handover and Cobie, Lean and Computing in Construction Congress (LC3): Volume I Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 279-288 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-080
5. 100%; open Tarek Mahfouz, Amr Kandil (2010) Unstructured Construction Document Classification Model Through Latent Semantic Analysis (LSA) , CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-25
6. 100%; open Edward Jaselskis, William Rasdorf, Min Liu, Abdullah Alsharef, Frank Bowen, Majed Al-Ghandour and Larry Goode (2017) Factors Affecting Bid Let Dates on Transportation Mega Projects, Lean and Computing in Construction Congress (LC3): Volume I Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 3-10 http://itc.scix.net/cgi-bin/works/Show?lc3-2017-081
7. 100%; open Ulrich Hartmann, Petra von Both (2010) Metrics for the Analysis of Product Model Complexity, CIB W78 2010 - Applications of IT in the AEC Industry http://itc.scix.net/cgi-bin/works/Show?w78-2010-24
8. 100%; open TD Dakovsky & RA Zaharieva (2005) Economic Expediency of Building Waste Recycling, http://itc.scix.net/cgi-bin/works/Show?w78-2005-a6-4-dakovski
9. 100%; open Anita Moum, Tore Haugen, Christian Koch (2007) What did you learn from practice today?, 239 http://itc.scix.net/cgi-bin/works/Show?w78_2007_17


 

hosted by University of Ljubljana



includes

W78




© itc.scix.net 2003
Home page of this database login Powered by SciX Open Publishing Services 1.002 February 16, 2003