Paper title: |
Os Sistemas BIM e a Redução de Inexatidões e Tempo nas Obras Públicas Brasileiras |
Authors: |
Santos de Andrade, Ludmila; Neander Furtado Silva; Ecilamar Maciel de Lima; Igor Monteiro |
Summary: |
The creation of an algorithm that will allow the quantitative accuracy of inputs, related to the Brazilian reality, inside the BIM platform will cause a decrease of the public costs of work. However, in this article only focus on how you can modify internally the BIM system platform for achieving the quantitative goals in planning materials. The new tool of construction planning and scheduling when using BIM systems's contribution, through the external database, will provide the construction control based on composition of inputs along the time that will allow a more economical execution to ensure the efficiency of public buildings. |
Type: |
|
Year of publication: |
2013 |
Keywords: |
Algorithm; Accuracy of inputs; BIM; Database; Planning; Scheduling; Public buildings |
Series: |
CUMINCADes:SIGRADI |
Download paper: |
/pdfs/sigradi2013_95.content.pdf |
Citation: |
Santos de Andrade, Ludmila; Neander Furtado Silva; Ecilamar Maciel de Lima; Igor Monteiro (2013).
Os Sistemas BIM e a Redução de Inexatidões e Tempo nas Obras Públicas Brasileiras. SIGraDi 2013 [Proceedings of the 17th Conference of the Iberoamerican Society of Digital Graphics - ISBN: 978-956-7051-86-1] Chile - Valparaíso 20 - 22 November 2013, pp. 284 - 287,
http://itc.scix.net/paper/sigradi2013_95
|