Paper title: | Time-cost relationship for residential construction in Texas |
Authors: | Choudhury I, Rajan S S |
Summary: | Studies indicate that there is a relationship between project cost and construction time for different construction markets. The purpose of this study is to validate the time-cost relationship model developed by Brolmilow et al. in context with residential construction projects in Texas. The data for the study was obtained from about 55 completed residential projects. The results indicate that Bromilow et al.’s model holds good for the Texas Construction Industry at the level of significance (p-value) of <0.0001. |
Type: | |
Year of publication: | 2003 |
Series: | w78:2003 |
ISSN: | 2706-6568 |
Download paper: | /pdfs/w78-2003-73.content.pdf |
Citation: | Choudhury I, Rajan S S (2003). Time-cost relationship for residential construction in Texas. Amor R (editor) Proceedings of the CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284, ISBN 0-908689-71-3, Waiheke Island, New Zealand, 23-25 April 2003, pg. 73-80. (ISSN: 2706-6568), http://itc.scix.net/paper/w78-2003-73 |