Paper title: |
A PROCESS MODEL FOR CONSTRUCTION SYNCHRONISATION USING TIME-SPACE PLANNING METHODS AND FIELD FORCE AUTOMATION |
Authors: |
Ha_kan Norberg & Thomas Olofsson |
Summary: |
This paper explores a proposed process model for construction synchronisation. The aim of the paper is to show the potential of working according to the Last Planner System of production and control by combining time-space planning methods and Field Force Automation. In addition, the paper aims to show the benefits of working with real time support regarding taking control actions in the schedule and to collect data for follow- up analysis. The paper first provides a background of the research and a description of the various methods and tools used in the process model. A process model is proposed based on the last planner and control system for the implementation of a new ICT tool with the purpose to enhance, planning and control in order to enhance construction synchronisation. It is concluded that site managers needs tools to change their view of planning from static view of the schedule which can be revised once or twice per project to the view that the schedule is a total dynamic instrument to be used to develop prognosis and measure for avoiding waste and delays in the realisation phase of the construction project. The paper is concluded with suggestions for how the method can be further developed and improved. |
Type: |
normal paper |
Year of publication: |
2008 |
Keywords: |
Construction synchronisation, Last Planner, 4D modelling, location based scheduling, field force automation |
Series: |
w78:2008 |
ISSN: |
2706-6568 |
Download paper: |
/pdfs/w78-2008-1-02.pdf |
Citation: |
Ha_kan Norberg & Thomas Olofsson (2008).
A PROCESS MODEL FOR CONSTRUCTION SYNCHRONISATION USING TIME-SPACE PLANNING METHODS AND FIELD FORCE AUTOMATION. CIB W78 2008 - Improving the management of construction projects through IT adoption (ISSN: 2706-6568),
http://itc.scix.net/paper/w78-2008-1-02
|